Area Project Superintendent - Data Center Construction
- Location
- Lockhart, TX
- Posted
- 81 days ago
How well does your resume fit this job?
Upload your resume to see your score for this Sundt Construction role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
Job Summary
The Project Superintendent (PS) will plan, coordinate, and supervise the field and/or administrative operations of projects. They will provide technical direction and have responsibility for the safety, costs, productivity, profitability, and overall quality of the work (including self-performed work) for the project(s).
The PS will establish productivity goals and measure performance as well as schedule labor, materials, and equipment, including the work of subcontractors and may supervise one or more field superintendents.
This position includes 'steps', which provide for a progression of skill and experience. - Sr. Project Superintendent I is capable of fairly large projects of $51-$100 million in size with typically 10-15 years' experience. - Sr. Project Superintendent II is capable of larger projects of a complex nature and/or multiple projects totaling $100-$199 million and typically with a minimum of 15 years' of experience.
Key Responsibilities
- Assists in the review of shop drawings, submittals, subcontract change orders and purchase orders.
- Conducts weekly coordination meetings with project teams and subcontractors and prepares daily field status reports.
- Coordinates the documentation of design conflicts and clarifications with the appropriate personnel.
- Develops and manages the construction plan for the successful execution of the work performed.
- Ensures work is executed according to contract terms and conditions in a profitable manner.
- Interacts effectively with owners, teams and other stakeholders to maintain a positive project environment and exceptional client experience.
- Prepares and updates the original CPM Project Schedule and ensures the schedule is kept current to manage the project appropriately while utilizing LEAN processes and Weekly Work Plans.
- Provides leadership and guidance to assigned project team members and subcontractors.
- Responsible for project success, including profitability, safety, schedule, quality and customer satisfaction.
- Responsible for the development and implementation of the Project Quality Management and Safety plans according to Sundt standards.
- Responsible for the timely completion of all punch lists and develops a schedule as required by the owner for the successful start-up and commissioning of all systems.
Minimum Job Requirements
- Excellent communication, organizational, and supervisory skills are essential.
- Four-year engineering degree or equivalent combinations of technical training and/or related experience required.
- Must have a thorough knowledge of all aspects of construction (technology, equipment, and methods), negotiations, engineering, cost control, scheduling, and safety.
- Must have construction project and supervision experience in similar types of facilities.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements
- Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
- May reach above shoulder heights and below the waist on a frequent basis
- May stoop, kneel, or bend, on an occasional basis
- May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors
- Must be able to comply with all safety standards and procedures
- Occasionally will climb stairs, ladders, etc.
- Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
- Will interact with people frequently during a shift/work day
- Will lift, push or pull objects on an occasional basis
- Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
#LI-HW1
Benefit list
- Market Competitive Salary (paid weekly)
- Bonus Eligibility based on company, group, and individual performance
- Employee Stock Ownership Plan & 401K
- Industry Leading Health Coverage Starting Your First Day
- Flexible Time Off (FTO)
- Medical, Health Savings, and Wellness credits
- Flexible Spending Accounts
- Employee Assistance Program
- Workplace Wellness Programs
- Mental Health Program
- Life and Disability Insurance
- Employee-Owner Perks
- Educational Assistance
- Sundt Foundation - Charitable Employee-Owner's program
Notice to External Search Firms
Sundt Construction's Talent Acquisition team is the only authorized department to engage with and execute agreements on behalf of the company with external search firms, staffing agencies, and other third-party recruiting partners. Sundt Construction does not accept unsolicited candidate submissions. We will only consider candidates submitted by agencies that have a fully executed agreement with Sundt Construction on file prior to the candidate's submission.
Any candidate submitted without an active, fully executed agreement will not be considered a qualified referral, and Sundt Construction assumes no obligation to pay any placement or recruiting fees. Additionally, any unsolicited resumes submitted to any Sundt Construction employee—including hiring managers or other personnel—will be deemed the property of Sundt Construction without any obligation to the submitting agency.
About the company
As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.
At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.
Equal opportunity and legal notices
Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.
From Sundt Construction's careers page, posted on September 8, 2026, first listed on Rolev.ai on November 25, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Area Project Superintendent - Data Center Construction role at Sundt Construction, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
Common questions
Where is the Area Project Superintendent - Data Center Construction job at Sundt Construction located?
This Area Project Superintendent - Data Center Construction position at Sundt Construction is located in Lockhart, TX. Always check Sundt Construction's application page for specific state eligibility or relocation policies.
How do I apply for the Area Project Superintendent - Data Center Construction position at Sundt Construction?
This listing links directly to Sundt Construction's application page. You can apply directly on Sundt Construction's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.