Meta
Cloud Infrastructure & DevToolsDirect employer career site

Connectivity Engineer, Lease - Data Center Construction

Pay
$123,000 – $176,000 per year
Location
Remote (US)
Job type
Full-time
Level
Senior
Experience
5+ years
Listed
28 days ago

Skills & highlights for this role

  • data center construction management
  • fiber optic testing
  • quality assurance and quality control
  • Primavera P6

Also useful

  • OSP cabling
  • OTDR/OLTS testing
  • IP network deployment

Stated benefits & perks

  • Bonus
  • Equity

About the role

  • Skip to main content
  • Jobs
  • Teams
  • Career Programs
  • Working at Meta
  • Blog
  • Podcasts
  • Jobs
  • Connectivity Engineer, Lease - Data Center Construction
  • Remote, US
  • Data Center Design, Engineering, & Construction
  • + 1 more

Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our innovative services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta ’s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta ’s server banks.

The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.

Connectivity Engineer, Lease - Data Center Construction Responsibilities

Project Planning & Control - Create, maintain, and report on site project and program scope, schedules and milestones. Work closely with site project management team throughout the project lifecycle from the creation of project and program plans through project close out

  • Learnings - Continually review ongoing projects for efficiencies in schedule, budget, and opportunities to enable cross-functional partners to be successful.
  • Document data points to assist with field coordination of projects.
  • Support development of project management best practices and initiatives, coordinating SOPs/SIPs with vendors, and participating in global and regional standards.
  • Coordinate lessons learned with the DEC Center of Excellence
  • Forecasting - Support project controls team with forecasting and budget efforts as required. Share current project status with upstream and downstream partners, ensuring crisp and complete handoffs between teams
  • Technical Reviews - Establish milestones for equipment purchase and track and report against these milestones Assist with the selection and review of a contractor to support the structured cabling work within a data center
  • Metrics - Report progress and risks on site projects and other initiatives to key stakeholders
  • Workflow - Work with installation partners to establish and track milestones.
  • Conduct pre-project planning, project handoffs, and ensure design delivery and verification.
  • Identify and respond to project risks and high-priority issues rapidly and effectively through effective action and appropriate escalation.
  • Track and manage project change order requests

Vendor Field Management - Responsible for all connectivity activities (OSP/ISP) within construction, projects on site including tracking and reporting actual progress related to schedule expectations. Set and communicate clear expectations together with the immediate site team, build key relationships with our installation partners and drive best practices, safe working environment and execute to a vision of ‘right first time.’

Quality Assurance - Perform physical inspections to ensure vendor work meets DEC quality standards throughout the lifecycle of the data center. Validate physical installs, test reports, build accuracy, material and local code compliance including constructability reviews on multiple design phases

Technical Field Lead - Technical lead for industry and Meta standards, responsible to lead product evaluation, design, and installation methods in the field including scope clarification, design and installation details as the owner of the Request for Information process

Technical Coordination - Develop solutions to in-field scope-gap or clash issues. Partner with DEC design and engineering teams to digitally support design reviews, BOM reviews, and as-built drawing validations

  • Communications & Cross functional team engagement - Liaise with construction partners to ensure deliverables are met during new builds and retrofits.
  • Coordinate with logistics partners, vendors, and suppliers to ensure a smooth end to end flow of materials as needed.
  • Work closely with the relevant teams to proactively communicate progress and project risks and initiatives to key stakeholders
  • Safety - Ensure that vendors adhere to safety obligations in accordance with local regulations and DEC Safety best practices.
  • Lead a 'safety first' environment, with open and transparent communication.
  • Acknowledging appropriate EHS practices

Travel - Position is remote and will require a minimum of 50% travel

Minimum Qualifications

5+ years of experience in project management for data center connectivity, construction, or telecommunications infrastructure

  • Experience engaging and guiding stakeholders
  • Experience providing solutions to construction related problems
  • Experience with Google Workspace

Preferred Qualifications

  • Experience reviewing and leading installations to design documents and specifications
  • Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews)
  • Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal
  • Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing
  • Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies
  • Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements)

Experience with Primavera 6

  • Experience in leading deployments of Network/Structure cabling infrastructure
  • Experience with fiber optic testing at scale, inclusive of complex troubleshooting
  • Data center development and/or construction management experience
  • Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance

Find your role

  • Explore jobs that match your skills and experience. Search by technology, team or location to find an opening that’s right for you.
  • View jobs
  • Recruiters can view your conversations with AI. Using AI is optional and does not impact the outcome of your application process.Learn more about AI usage and settings.
  • Sign up to ask follow-up questions
  • Job Search
  • Technology Teams
  • Artificial Intelligence
  • Creative
  • Infrastructure
  • Metaverse and Wearables
  • Product and Program Management
  • Research and Data
  • Security
  • Software Engineering
  • Business Teams
  • Business Operations
  • Partnerships
  • Sales and Marketing
  • Career Programs
  • Research
  • Accelerate Eng Talent
  • Students and Grads
  • Rotational Programs
  • Working at Meta
  • Accessiblity and Engagement

Benefits

  • Culture
  • Hiring Process
  • My account
  • Career profile
  • Account settings
  • Messages
  • Meta Careers Blog
  • Meta Tech Podcasts

About Meta

Meta builds technologies that help people connect, find communities, and grow businesses. When Facebook launched in 2004, it changed the way people connect. Apps like Messenger, Instagram and WhatsApp further empowered billions around the world. Now, Meta is moving beyond 2D screens toward immersive experiences like augmented and virtual reality to help build the next evolution in social technology.

People who choose to build their careers by building with us at Meta help shape a future that will take us beyond what digital connection makes possible today—beyond the constraints of screens, the limits of distance, and even the rules of physics.

For those who live in or expect to work from California if hired for this position, please click here for additional information.

United States of America: $123,000/year to $176,000/year + bonus + equity + benefits

Individual compensation is determined by skills, qualifications, experience, and location. Compensation details listed in this posting reflect the base hourly rate, monthly rate, or annual salary only, and do not include bonus, equity or sales incentives, if applicable. In addition to base compensation, Meta offers benefits. Learn more about benefits at Meta.

About Meta

  • Media gallery
  • Brand resources
  • For investors
  • Looking for contractor roles?
  • Community Standards
  • Data Policy
  • Terms
  • Cookie Policy
Read the original posting

From Meta's careers page, first listed on Rolev.ai on October 12, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Connectivity Engineer, Lease - Data Center Construction role at Meta, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Connectivity Engineer, Lease - Data Center Construction role at Meta?

The Connectivity Engineer, Lease - Data Center Construction posting at Meta states compensation of $123,000 – $176,000 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on Meta's official career site.

Where is the Connectivity Engineer, Lease - Data Center Construction job at Meta located?

Yes, this Connectivity Engineer, Lease - Data Center Construction opening at Meta is listed as Remote (US). Always check Meta's application page for specific state eligibility or relocation policies.

What qualifications are required for Connectivity Engineer, Lease - Data Center Construction at Meta?

For the Connectivity Engineer, Lease - Data Center Construction role, Meta highlights 5+ years of relevant experience; experience with data center construction management, fiber optic testing, quality assurance and quality control, Primavera P6. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the Connectivity Engineer, Lease - Data Center Construction position at Meta?

This listing links directly to Meta's application page. You can apply directly on Meta's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.