CPG Beyond, Inc.
Direct employer career site

Construction Scheduler II

Location
United States Alexandria, LA
Posted
55 days ago
Free · No account needed

How well does your resume fit this job?

Upload your resume to see your score for this CPG Beyond, Inc. role, what matches, what's missing, and your best other matches.

Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.

About the role

LOCATION: Alexandria, Louisiana

Position Summary

The Construction Scheduler II will provide various functions, which primarily involve providing expertise in the area of project controls, scheduling, and schedule analysis; earned value management and construction activities in support of a construction program. They will ensure that a project is carried out within the projected time-frame and work closely with Project Managers and site staff to compile data for cost and time status on projects.

Essential Duties and Responsibilities

  • Develop resource load and level project schedules using the performance work statement (PWS), technical proposal, WBS, and oral directions from senior project managers and technical leads.
  • Understand EVMS best practices.
  • Understand and implement accepted Planning & Scheduling best practices.
  • Understand Cost/Schedule Risk Analysis.
  • Analyze drawings, specifications, and statements of work in the preparation and acceptance of usable Baseline schedules for construction.
  • Monitor multiple project schedules being developed and updated by Operations staff and provide guidance, as necessary.
  • Interact with the Operations team and represent CPG and its partners in the best manner to owners, subcontractors, and their representatives.
  • Support the development of conceptual bid and proposal schedules with executive management and present to selection committees if required.
  • Utilize analytics to identify and report on project trends.
  • Effectively cost and manpower load schedules for use during the execution of the project.
  • Evaluate the actual construction status relative to proposed plan.
  • Analyze and communicate the impact of changes to the schedule.
  • Prepare Time Impact Analyses per recommended practices by commonly accepted standards.
  • Travel to project sites.
  • Critique, create, and recommend improvements to departmental policies and procedures.
  • Be responsible for special projects and other departmental duties as necessary.

Qualifications

Education/Experience

  • Undergraduate degree in Engineering, Architecture, Construction Management or a related discipline.
  • 3-5 years scheduling experience on commercial construction project (Data Center Experience a plus!) with at least 8 years focused on planning and scheduling.
  • Proven success implementing strategic initiatives.
  • Familiarity with the concepts of Lean Scheduling, EVMS, resource loaded scheduling, and its interface into traditional CPM schedule is preferred.

Computer Skills

  • Advanced proficiency in Microsoft Project

Certificates and Licenses

  • OSHA certification preferred
  • Electrical and safety certificates/licenses.

Supervisory Responsibilities

  • No supervisory responsibilities

Physical Demands

  • While performing the duties of this job, the employee is regularly required to sit; Standing and walking is required. The noise level in the work environment is usually moderate. The employee must occasionally lift and carry up to 50 pounds.

Additional information

The above job description is not intended to be an all-inclusive list of duties and standards of the position. Incumbents will follow any other instructions, and perform any other related duties, as assigned by their supervisor.

Benefits to Joining Our Team

CPG offers a competitive and comprehensive package that includes additional benefits beyond enhanced medical, dental, and vision coverage

Benefits

Health Benefits - (Medical, Dental & Vision Insurance):

  • Flexible Spending Account Options
  • 401K Plan
  • Employer paid Life & Disability Insurance
  • Paid Time Off
  • Employee Referral Program
  • Employee Assistance Program (EAP)

Pre Employment Requirements

Employment is contingent upon successful completion of a pre-employment background check, drug screening, and motor vehicle record (MVR) review, in accordance with applicable federal, state, and local laws. Positions requiring driving must have an MVR that meets company and insurance carrier standards.

#LI-TG1

Read the original posting

From CPG Beyond, Inc.'s careers page, posted on October 1, 2026, first listed on Rolev.ai on November 25, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Construction Scheduler II role at CPG Beyond, Inc., it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Construction Scheduler II job at CPG Beyond, Inc. located?

This Construction Scheduler II position at CPG Beyond, Inc. is located in United States Alexandria, LA. Always check CPG Beyond, Inc.'s application page for specific state eligibility or relocation policies.

How do I apply for the Construction Scheduler II position at CPG Beyond, Inc.?

This listing links directly to CPG Beyond, Inc.'s application page. You can apply directly on CPG Beyond, Inc.'s site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.