Controls Design Manager - Data Center Construction
- Pay
- $170,000 – $210,000 per year
- Location
- Remote (US)
- Listed
- 3 days ago
About the role
Turner & Townsend is seeking a Controls Design Manager to work with our team and partner with our client, supporting design leadership for new and existing construction builds, with a focus on data center development.
The Controls Design Manager should have a strong background in building automation systems (BAS), industrial controls, SCADA, PLC-based systems, and data center critical infrastructure controls, with deep experience in controls design, engineering leadership, integration, and commissioning support.
Responsibilities
- Provides support and reports to the assigned Project Manager(s) or Project Director. This position has frequent interaction with the Owner/Client, consultants, design professionals, systems integrators, and contractors.
- Directly assist the Project Manager(s) in managing, coordinating, and administering the project through all phases of design and construction, with an emphasis on controls systems design, integration, and automation strategy.
- Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client's needs are addressed, including technical guidance on Building Management Systems (BMS), Electrical Power Monitoring Systems (EPMS), SCADA systems, and critical facility controls architecture.
- Aids in the preparation of documents (reports, schedules, invoices, RFIs, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout, and client presentations) for programming, design, and construction, and will assist in maintaining information in project management software.
- Coordinate and schedule meetings with the project team as directed by the Project Manager(s).
- Communicate conceptual controls designs and create/maintain project documentation before, during, and after construction, including controls sequences of operation, controls design standards, points lists, network architecture drawings, and controls specifications.
- Maintain Basis of Design (BOD), prototype controls designs, and template specifications for automation and controls systems, ensuring alignment with evolving business, operational, and reliability requirements.
- Review and inform design RFPs, including scope development for controls engineering and systems integration services.
- Manage external controls consultants, commissioning providers, and systems integrators through the design and construction process, ensuring controls contract documents are completed on schedule, within budget, and in accordance with company standards.
- Effectively communicate controls standards and automation requirements to internal and external project partners, including engineering, operations, commissioning, and facilities teams.
- Manage multiple fast-paced projects simultaneously, providing strategic technical leadership across controls system design, integration, and operational readiness activities.
- Think outside the box to identify innovative controls solutions that improve operational efficiency, reliability, monitoring capabilities, and scalability while reducing lifecycle costs.
- Support procurement activities through vendor submittal reviews, controls equipment evaluations, factory witness testing (FAT), and integrated systems testing planning.
- Lead the review of controls sequences, alarms, trending strategies, system integrations, and monitoring requirements to ensure compliance with operational and reliability objectives.
- Identify and implement innovative technologies that enhance automation, predictive monitoring, energy efficiency, fault detection, and system resilience.
- Support commissioning and startup efforts, including controls functional performance testing, integrated systems testing (IST), and turnover documentation reviews.
- Stay current with industry advancements and apply best practices related to controls systems, automation technologies, cybersecurity requirements, and data center operations.
- Communicate and enforce engineering, controls, and design policies across the organization.
- SOX control responsibilities may be part of this role and are to be adhered to where applicable.
Qualifications & Requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, Controls Engineering, Automation Engineering, or related field.
- 8+ years of experience in controls design, building automation, industrial automation, or mission-critical facilities.
- Experience with Building Management Systems (BMS), Electrical Power Monitoring Systems (EPMS), SCADA, PLCs, and networked control systems.
- Experience supporting hyperscale data center, mission-critical, or industrial facility projects.
- Strong understanding of integrated systems testing, commissioning, and controls system operations.
- Familiarity with control system cybersecurity requirements and industry standards.
- Excellent communication, stakeholder management, and leadership skills.
Additional Information
The salary range for this full-time role is $170K-$210K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate's experience and qualifications.
*On-site presence and requirements may change depending on our client's needs.*
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
#LI-AP5
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
About the Company
Who is Turner & Townsend?
All over the world people are using buildings, infrastructure, and assets we helped to deliver. It could be the hospital they work in, the railway they travel on every day, the fuel that powers their car or the data centre they depend on at work. For more than 75 years we've been helping to deliver transformational programmes across the real estate, infrastructure and natural resources sectors, making a difference to people's lives and ensuring a return on investment for our clients and their investors.
Our purpose: Transforming performance for a green, inclusive, and productive world.
The world is changing and we have a responsibility to support that change, helping drive it and be part of it. Through the commitment, capability and care our team brings, we build trust between clients, suppliers, governments and society. Delivering better outcomes that have a positive impact on the world around us. We work smarter to face the challenges of the future; bringing the clarity that helps teams realise their full potential across the real estate, infrastructure and natural resources sectors. It's how we've made the difference for more than 75 years.
Our values
Love a challenge: We love a challenge and we work hard to make change happen and see things through. We don't stand still, challenging ourselves and others to do better every day. And we are trusted to do the right thing, raising standards all the time.
Stronger together: We're stronger together by connecting people in diverse teams, so that we can all collaborate to deliver our best work. We focus on what matters and use our influence to build a better world for everyone.
Bring out the best in everyone: We bring out the best in everyone. We help each other to make the most of our potential, always learning from our experience. We treat each other with care and respect and make time to give everyone a voice
Equal opportunity and legal notices
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
From Turner & Townsend's careers page, first listed on Rolev.ai on November 6, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Controls Design Manager - Data Center Construction role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
- Controls Design Engineer IIHitachi · Ogden, UT
- Controls Design Engineer (EPMS), CDEAmazon Data Services, Inc. · Seattle, WA
- Controls Design Engineer, Data Center Engineering, GSIAmazon Web Services, Inc. · Seattle, WA
- Controls DesignerTrane Technologies · Columbus, OH
- Controls DesignerBdx · USA NE - Holdrege
- Controls Designer (BOS USA)BOS Innovations · Lexington, KY
Common questions
What is the salary for the Controls Design Manager - Data Center Construction role at Turner & Townsend?
The Controls Design Manager - Data Center Construction posting at Turner & Townsend states compensation of $170,000 – $210,000 per year. Final pay may depend on location, experience, and interview evaluation on Turner & Townsend's official career site.
Where is the Controls Design Manager - Data Center Construction job at Turner & Townsend located?
Yes, this Controls Design Manager - Data Center Construction opening at Turner & Townsend is listed as Remote (US). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.
How do I apply for the Controls Design Manager - Data Center Construction position at Turner & Townsend?
This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.