CSA Lead, Data Center Construction
- Location
- Austin, TX
- Listed
- Today
About the role
Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.
Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth.
SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.
SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future-today.
Come join us in accelerating the energy and infrastructure transition!
Basic Function
Leadership of the datacenter construction team is committed to offering every team member an opportunity to engage your core skills and knowledge, while helping each person develop new and valuable skills throughout the duration of the project.
The CSA Lead is responsible for the design oversight, technical coordination, and delivery of civil, structural, and architectural (CSA) systems across data center construction projects. This role ensures that site development, building structure, and architectural systems are designed, implemented, and constructed to meet performance, durability, and scalability requirements.
This individual works cross-functionally with internal teams, external design partners, and construction stakeholders to translate design intent into successful project execution.
Responsibilities
- Manage CSA scope from construction through closeout.
- Coordinate with civil, structural, and architectural design consultants to ensure alignment with Owner standards, tenant requirements, and local codes.
- Ensure CSA designs integrate seamlessly with MEP, IT, and commissioning requirements.
- Review and track submittals, RFIs, change orders, and field clarifications related to CSA scope.
- Monitor contractor performance for schedule, cost, quality.
- Participate in site walks, inspections, and quality audits.
- Support layout coordination for critical equipment, white space, and support areas to optimize constructability and operations.
- Support commissioning activities related to building envelope, structural readiness, and site infrastructure.
- Identify design and constructability risks early and drive mitigation strategies
- Validate pay applications and change order pricing for CSA packages.
- Assist in cost estimating, budget management, and forecasting for civil, structural, and architectural packages.
- Provide technical guidance to project engineers and project coordinators.
Qualifications/Requirements
- Bachelor's degree in Civil Engineering, Structural Engineering, Architecture, or related field
- 5 + years of experience in project engineering, construction management, or design management.
- Strong knowledge of site development, structural systems, and building design
- Ability to read, interpret, and coordinate construction drawings across multiple disciplines.
- Strong communication and cross-functional collaboration skills
- Detail-oriented with a proactive problem-solving mindset.
- Experience on large-scale commercial, industrial, or mission critical projects (strongly preferred)
Location: Site-based role in Borden County, TX (Near Lubbock)
Pay and benefits
The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks-while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.
Our Health & Wellness Benefits
At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:
- 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
- 401(k) with Company Match
- Generous Paid Time Off + 11 Paid Holidays
- 12 Weeks Paid Parental Leave
- Life, AD&D & Long-Term Disability Coverage
- Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
- Mental, Physical & Social Wellness Support (with company contributions)
- Flexible Work Arrangements & Hybrid Office Setup Benefits
- Monthly Reimbursement for Phone, Internet & Data
- Optional Legal & Pet Insurance Plans
- Device Purchase Support
- At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible.
- We work to serve local communities through volunteering, fundraising, and much more.
- For example, we're proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training.
- When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!
- #LI-ONSITE
- #LI-AM1
Equal opportunity and legal notices
SB Energy is built on a foundation of collaboration and inclusion. We are proud to be an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class.
From Sb Energy's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this CSA Lead, Data Center Construction role at Sb Energy, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Common questions
Where is the CSA Lead, Data Center Construction job at Sb Energy located?
This CSA Lead, Data Center Construction position at Sb Energy is located in Austin, TX. Always check Sb Energy's application page for specific state eligibility or relocation policies.
How do I apply for the CSA Lead, Data Center Construction position at Sb Energy?
This listing links directly to Sb Energy's Greenhouse application page. You can apply directly on Sb Energy's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Greenhouse application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.