AECOM
Direct SmartRecruiters career site

Data Center Construction Managers

Pay
$160,000 – $195,000 per year
Location
Boulder City, NV · On-site
Job type
Full-time
Level
Senior
Experience
8+ years
Education
Bachelor's degree
Listed
Yesterday

Skills & highlights for this role

  • construction inspection
  • quality control
  • mechanical systems
  • electrical systems
  • shop drawing review
  • commissioning
  • contract compliance

Also useful

  • Certified Quality Manager (CQM)
  • construction management
  • project closeout
  • outage coordination

About the role

AECOM is seeking Data Center Construction Managers. This position will be onsite in Las Vegas, Nevada.

Job responsibilities include and are not limited to the following

  • Inspect building systems, including mechanical and electrical, for compliance with contract requirements and industry standards.
  • Review contractor shop drawings and submittals to confirm alignment with project specifications.
  • Monitor the installation, testing, and commissioning of electrical and mechanical systems, confirming proper functionality and performance.
  • Identify and report non-conformances, coordinating with contractors and engineers to implement corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections, punch lists, and project closeouts.
  • Witness and document critical tests, such as pressure tests, leak tests, and system start-ups.
  • Verify the quality of materials, workmanship, and equipment installations to confirm adherence to project specifications.
  • Work closely with contractors, engineers, and other inspectors to resolve issues.
  • Maintain professionalism in attire and communication during all time on site and in meetings.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client Outage / Shutdown Procedure.
  • Coordinate GC Workplan and advise if the construction contractor fails to promptly remove, correct, or replace unacceptable construction work, and assess any delays caused by such failure.

Minimum Requirements

  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.

Preferred Requirements

  • 7 years of experience with construction and/or quality management.
  • CQM or other professional certifications.
  • Bachelor's degree in construction management, engineering, or architecture.

Additional Information

  • Sponsorship for US employment authorization is not available now or in the future for this position.
  • Relocation is not available for this position.

At AECOM, we are committed to maintaining a secure and trustworthy recruitment process and take any fraudulent hiring activity seriously. To support this commitment, all newly hired employees are required to attend an in-person Day 1 onboarding at an AECOM office location as a condition of employment.

About the Company

Work with Us. Change the World.

At AECOM, we're delivering a better world. Whether improving your commute, keeping the lights on, providing access to clean water, or transforming skylines, our work helps people and communities thrive. We are the world's trusted infrastructure consulting firm, partnering with clients to solve the world's most complex challenges and build legacies for future generations.

There has never been a better time to be at AECOM. With accelerating infrastructure investment worldwide, our services are in great demand. We invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world.

We're one global team driven by our common purpose to deliver a better world. Join us.

About AECOM

AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, flexible work options, well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.

AECOM is the global infrastructure leader, committed to delivering a better world. As a trusted professional services firm powered by deep technical abilities, we solve our clients' complex challenges in water, environment, energy, transportation and buildings. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle - from advisory, planning, design and engineering to program and construction management. AECOM is a Fortune 500 firm that had revenue of $16.1 billion in fiscal year 2025. Learn more at aecom.com.

What makes AECOM a great place to work

You will be part of a global team that champions your growth and career ambitions. Work on groundbreaking projects - both in your local community and on a global scale - that are transforming our industry and shaping the future. With cutting-edge technology and a network of experts, you'll have the resources to make a real impact.

Our award-winning training and development programs are designed to expand your technical expertise and leadership skills, helping you build the career you've always envisioned. Here, you'll find a welcoming workplace built on respect, collaboration and community-where you have the freedom to grow in a world of opportunity.

Read the original posting

From AECOM's careers page, first listed on Rolev.ai on November 14, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Data Center Construction Managers role at AECOM, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Data Center Construction Managers role at AECOM?

The Data Center Construction Managers posting at AECOM states compensation of $160,000 – $195,000 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on AECOM's official career site.

Where is the Data Center Construction Managers job at AECOM located?

This Data Center Construction Managers position at AECOM is located in Boulder City, NV (On-site). Always check AECOM's application page for specific state eligibility or relocation policies.

What qualifications are required for Data Center Construction Managers at AECOM?

For the Data Center Construction Managers role, AECOM highlights 8+ years of relevant experience; a bachelor's degree; experience with construction inspection, quality control, mechanical systems, electrical systems, shop drawing review, commissioning. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the Data Center Construction Managers position at AECOM?

This listing links directly to AECOM's SmartRecruiters application page. You can apply directly on AECOM's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.