Data Center Construction Senior MEP Manager
- Location
- Chantilly, VA · On-site
- Job type
- Full-time
- Level
- Director
- Listed
- Today
Skills & highlights for this role
- MEP systems
- commissioning
- BIM coordination
Also useful
- Tier certification
How well does your resume fit this job?
Upload your resume to see your score for this Worldwide Mission Critical role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
Summary
The Senior MEP Manager serves as the Owner's Representative and technical authority for large-scale, mission-critical data center campus construction projects, providing senior-level oversight and strategic direction to ensure delivery in accordance with the highest industry standards.
This role leads all aspects of MEP program execution, including OFCI equipment procurement strategy, site logistics, BIM coordination, and MOP development and enforcement. The Senior MEP Manager drives QA/QC governance across all MEP/F/FA/BMS systems and serves as the primary technical lead throughout all phases of the Commissioning process, from Cx planning through Tier certification.
Primary Responsibilities
- Serve as the senior Owner's Representative and primary technical authority, setting the standard for MEP execution across all phases of mission-critical data center construction.
- Proactively identify, assess, and mitigate Owner risk by holding contractors accountable to construction documents and enforcing rigorous compliance standards throughout project execution.
- Lead cross-functional stakeholder engagement at the program level, driving rapid resolution of complex technical and logistical issues across Owner, GC, subcontractor, and design teams.
- Provide executive-level oversight of MEP construction activities, including master schedule management, critical path analysis, material procurement, and senior reporting to Owner leadership.
- Champion site safety culture, ensuring full integration and enforcement of the site safety plan across all MEP trades and subcontractors.
- Direct all commissioning phases in close partnership with the CxA, providing senior technical leadership from pre-functional testing through integrated systems testing and Tier-level certification.
- Establish and enforce QA/QC frameworks across all Cx levels, leveraging internal engineering resources and external specialists to ensure systems meet design intent and Owner requirements.
- Hold the General Contractor accountable to program milestones, providing strategic direction and escalation management to maintain schedule integrity across all MEP scopes.
- Lead MEP change order review and negotiation, providing senior-level analysis to validate scope alignment, cost reasonableness, and schedule impact relative to project documents.
- Serve as the senior technical liaison between OFCI vendors, contractors, and design teams, resolving complex coordination challenges and ensuring consistent alignment with project requirements.
- Lead comprehensive review and approval of MEP submittals, shop drawings, and RFIs, leveraging deep systems knowledge to identify design gaps, constructability issues, and risk items early.
- Oversee and represent the Owner at factory witness tests for critical OFCI equipment, ensuring compliance with project specifications prior to shipment.
- Direct equipment inspection programs, leading deficiency identification, root cause analysis, and resolution management across all subcontractors, vendors, and contractors.
- Ensure full compliance with CxA documentation standards, coordinating and driving testing activities across all stakeholders with the rigor required for mission-critical Tier certification.
- Lead site-specific testing strategy and utility coordination, aligning all parties on sequencing, requirements, and Owner-critical milestones.
Skills, Knowledge, Education, and Experience
- Bachelor's degree in construction management, Electrical Engineering, Mechanical Engineering, or relevant field experience preferred.
- 15+ years of progressive MEP experience in mission-critical construction, including senior management or Owner's Representative roles on large-scale data center programs.
- Deep technical expertise in mission-critical MEP systems including high-voltage power distribution, UPS, generators, cooling infrastructure, and BMS/controls integration.
- Experience in building mission-critical data centers.
- Expert-level knowledge of applicable building codes, NFPA standards, and complex mechanical/electrical system integration in Tier III/IV data center environments.
- Proficiency in project management platforms, scheduling tools (P6/MS Project), BIM coordination software (Navisworks/Revit), and standard MS Office suite.
- Willingness to travel.
- Initiative, self-direction, and attention to detail.
- Demonstrated ability to lead, mentor, and develop multidisciplinary project teams in a high-performance, fast-paced environment.
- Executive-level communication and presentation skills, with proven ability to influence contractors, design teams, and senior Owner stakeholders to drive project outcomes.
- Capable of troubleshooting and resolving complex construction problems.
- Effective planning and organization skills.
- Flexibility and commitment to responsibilities.
- Excellent problem-solving and decision-making abilities.
- Exceptional communication and interpersonal skills.
Additional information
If you're ready to bring your expertise to a team that's redefining how data centers get built, we'd love to hear from you. At Worldwide Mission Critical, you'll find the support, trust, and room to grow that helped us become one of the fastest-growing companies in the country - and we're just getting started.
About Worldwide Mission Critical
Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.
From Worldwide Mission Critical's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Data Center Construction Senior MEP Manager role at Worldwide Mission Critical, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
All Construction Manager jobs- Project Manager VAECOM · Los Angeles, CA · $135k – $200k/yr
- Traveling Superintendent, Data CenterARCO National Holdings · Richmond Heights, MO
- Director, Capital ProjectsTake-Two Interactive Software, Inc. · Austin, TX
- Commercial Plumbing SuperintendentKelso Industries · Lorton, VA
- Traveling Superintendent, Data CenterARCO Companies · Richmond Heights, MO
- Director of Construction OperationsWillmeng Construction · Phoenix, AZ
Common questions
Where is the Data Center Construction Senior MEP Manager job at Worldwide Mission Critical located?
This Data Center Construction Senior MEP Manager position at Worldwide Mission Critical is located in Chantilly, VA (On-site). Always check Worldwide Mission Critical's application page for specific state eligibility or relocation policies.
What qualifications are required for Data Center Construction Senior MEP Manager at Worldwide Mission Critical?
For the Data Center Construction Senior MEP Manager role, Worldwide Mission Critical highlights experience with MEP systems, commissioning, BIM coordination. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.
How do I apply for the Data Center Construction Senior MEP Manager position at Worldwide Mission Critical?
This listing links directly to Worldwide Mission Critical's Lever application page. You can apply directly on Worldwide Mission Critical's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Lever application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.