Data Center Construction Senior Project Manager
- Location
- Hannibal, OH · On-site
- Job type
- Full-time
- Level
- Senior
- Experience
- 10+ years
- Education
- Bachelor's degree
- Listed
- Today
Skills & highlights for this role
- construction contract administration
- change order management
- commissioning and QA/QC review
Also useful
- data center construction
- Microsoft Project
How well does your resume fit this job?
Upload your resume to see your score for this Worldwide Mission Critical role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
Summary
The Senior Construction Project Manager will act as the Owner's Representative for mission-critical data center construction projects, serving as the primary point of accountability for project execution from design through commissioning.
This role is responsible for managing Owner's design, engineering, procurement, and construction contractors while maintaining oversight of construction quality, project budget, and schedule adherence. The Senior PM will work to minimize Owner risk, avoid change orders, and ensure all contractors are delivering per their agreements.
This is a highly visible, client-facing role that requires strong technical expertise, exceptional communication skills, and a deep understanding of mission-critical construction environments.
Primary Responsibilities
- Act as Owner's representative, adding value to the construction of data centers that meet or exceed industry standards while representing the Owner professionally and ethically at all times.
- Monitor daily construction activities at the project site, including scheduling of work and delivery of equipment and materials.
- Review submittals, drawings, and reports during the project design phase to identify and resolve potential issues before they impact construction.
- Track and report on work progress, budget status, and schedule status regularly to the Owner and company leadership in both verbal and written report form.
- Manage and finalize contract documents such as RFIs and change orders, preparing them for management review and approval.
- Review, verify, and approve contractor progress billings and provide initial evaluation of all contractor payment applications to ensure accuracy relative to actual project construction status.
- Assist in cash flow forecasting and processing of payment requests; represent Owner in contract and payment discussions with contractors.
- Review all commissioning, quality assurance, and quality control work and reporting completed by contractors; coordinate internal and external engineering support as needed.
- Work with Owner's operations staff, asset manager, and O&M provider to facilitate field visits and document review in anticipation of substantial completion and commercial operation date.
- Manage internal project team to produce client deliverables and prioritize Owner site representative activities and inspections to monitor contractor performance.
- Represent Owner and coordinate site tours as needed for investors, utility representatives, and other stakeholders.
- Provide support for and/or lead construction contract negotiations and RFP production.
- Perform due diligence tasks on new project opportunities and conduct site assessments of potential projects.
- Coordinate with and direct Owner's consultants as needed throughout the project lifecycle.
- Work to mitigate change orders and ensure construction is undertaken properly with Owner's risk minimized at every stage.
Skills, Knowledge, Education, and Experience
- Bachelor's degree in Construction Management, Engineering, or a related field preferred.
- 10+ years of relevant experience in a construction or project management role.
- Experience with construction contract administration and knowledge of related construction practices.
- Prior experience in mission-critical or data center environments strongly preferred; experience in utility electricity generation a plus.
- Strong proficiency in Microsoft Excel, Word, Project, PowerPoint, and Outlook.
- High levels of initiative, self-direction, and attention to detail with the ability to work effectively in a close team environment.
- Ability to motivate contractors through solid communication skills and contract knowledge to accomplish Owner and project goals.
- Capable of planning and organizing internal and external resources across complex, multi-stakeholder projects.
- Strong analytical and problem-solving skills with sound decision-making ability under pressure.
- Willingness to take on responsibilities with a commitment to perform and the flexibility to adapt as project needs evolve.
- Excellent communication and interpersonal skills with the ability to direct troubleshooting and resolution of highly complex or unusual construction problems.
- Willingness to travel to project sites as required.
Additional information
If you're ready to bring your expertise to a team that's redefining how data centers get built, we'd love to hear from you. At Worldwide Mission Critical, you'll find the support, trust, and room to grow that helped us become one of the fastest-growing companies in the country - and we're just getting started.
About Worldwide Mission Critical
Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission critical industry, helping companies deliver their data centers on time and under budget. Worldwide Mission Critical was founded on the principle that the right team of experienced data center professionals will deliver great projects. Our ability to put together oversight for all aspects of a project sets us apart.
From Worldwide Mission Critical's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Data Center Construction Senior Project Manager role at Worldwide Mission Critical, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
All Construction Project Manager jobs- Project Manager - Ground UpTurner & Townsend · Tucson, AZ
- Project ExecutiveS&B USA · Glen Burnie, MD
- Director, Capital ProjectsTake-Two Interactive Software, Inc. · Novato, CA
- Assistant Project ManagerLoenbro · Douglas, GA
- Pre-Construction Manager, GES NA, Design and ConstructionAmazon.com Services LLC · New York, NY
- Project ManagerAble Services · San Francisco, CA
Common questions
Where is the Data Center Construction Senior Project Manager job at Worldwide Mission Critical located?
This Data Center Construction Senior Project Manager position at Worldwide Mission Critical is located in Hannibal, OH (On-site). Always check Worldwide Mission Critical's application page for specific state eligibility or relocation policies.
What qualifications are required for Data Center Construction Senior Project Manager at Worldwide Mission Critical?
For the Data Center Construction Senior Project Manager role, Worldwide Mission Critical highlights 10+ years of relevant experience; a bachelor's degree; experience with construction contract administration, change order management, commissioning and QA/QC review. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.
How do I apply for the Data Center Construction Senior Project Manager position at Worldwide Mission Critical?
This listing links directly to Worldwide Mission Critical's Lever application page. You can apply directly on Worldwide Mission Critical's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Lever application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.