Data Center Constructions Scheduler - Mission Critical Projects (TX/GA)
- Location
- Remote (US)
- Posted
- 3 days ago
How well does your resume fit this job?
Upload your resume to see your score for this Apollomce role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
Position Summary
Apollo Mission Critical Engineering is seeking an experienced Data Center Construction Scheduler to support the planning, coordination, and execution of a mission-critical data center construction project.
The ideal candidate will have extensive experience developing, managing, and evaluating Critical Path Method (CPM) schedules using Primavera P6, with a strong understanding of construction sequencing, equipment installation, energization, and commissioning activities.
This position will work closely with the General Contractor, project management team, trade contractors, equipment vendors, and commissioning teams to ensure project schedules accurately reflect construction progress, resource requirements, critical milestones, and dependencies.
The Construction Scheduler will play an active role in identifying potential scheduling conflicts, evaluating project risks, and recommending corrective actions to support successful project execution.
Key Responsibilities
- Develop, maintain, and manage baseline construction schedules using Critical Path Method (CPM) best practices and Primavera P6, including detailed Work Breakdown Structures (WBS) for schedules with 2,500+ activities.
- Review and validate schedule logic, activity durations, sequencing, and resource allocations to ensure accuracy and alignment with project milestones and contractual requirements.
- Create and manage Primavera P6 layouts to efficiently update schedules, analyze critical paths, identify baseline variances, and generate customized reports by trade, timeframe, or project area.
- Resource-load baseline schedules to track earned value metrics and maintain cost and duration accuracy.
- Coordinate with General Contractors, project management teams, subcontractors, equipment vendors, and commissioning teams to align construction schedules with project execution requirements.
- Integrate equipment procurement, installation, energization, and commissioning activities, including L2 inspections, L3 startup, L4 functional testing, and L5 Integrated Systems Testing (IST).
- Monitor critical project milestones, including equipment deliveries, AHJ inspections, occupancy requirements, and substantial completion, while identifying potential delays and schedule risks.
- Lead weekly scheduling meetings, conduct job walks, and coordinate live schedule updates with Superintendents and project stakeholders to verify construction progress.
- Develop mitigation strategies, recovery schedules, and Time Impact Analysis (TIA) reports using historical CPM data to evaluate scheduling impacts and delays.
- Utilize Microsoft Excel to analyze large datasets, compare multiple schedules, and support scheduling reports and project performance evaluations.
- Interface directly with clients and project stakeholders to address scheduling concerns, communicate critical path impacts, and support project coordination.
- Manage mid-month and end-of-month deliverables, including.xer files, critical path reports, full schedules, 6 week look-ahead reports, and schedule narratives.
- Mentor, train, and assist in the professional development of junior schedulers.
- Other duties assigned.
Qualifications
- Minimum of two (2) years of Critical Path Method (CPM) scheduling experience on comparable mission-critical data center construction projects.
- Proficiency in Primavera P6 for developing, maintaining, analyzing, and updating detailed construction schedules.
- Strong understanding of construction sequencing, realistic activity durations, procurement, manpower planning, equipment integration, energization, and commissioning sequences and dependencies.
- Experience coordinating schedules with General Contractors, subcontractors, equipment vendors, and commissioning teams.
- Ability to evaluate schedule logic, identify potential delays and scheduling conflicts, and recommend corrective actions or recovery strategies.
- Strong organizational, analytical, problem-solving, and communication skills, with the ability to work independently and collaborate with multidisciplinary project teams.
Prerequisites for Employment
- Successful background check, including pre-employment drug screening
- US citizens, permanent residents or any candidate with eligibility to work in the US
Benefits
Apollo offers its employees a full benefits package, including:
- Health and wellness plans (medical, dental, vision, life, disability)
- Flexible spending accounts
- Paid time off, holidays, and more
- Paid parental leave
401K plan with immediate match benefits
- Employee assistance programs
- Tuition reimbursement programs
- Employee discount programs
About Us
Apollo Mission Critical Engineering is a mission-critical infrastructure engineering, construction, commissioning, and operations support services company. We serve mission-critical industries globally, providing commissioning, QA/QC, emergency response, operations support, and owner's representative services.
Since our inception, we have built a company founded on trust, strong relationships, and a commitment to delivering exceptional results. We seek talented professionals who thrive in challenging environments, value collaboration, and are passionate about supporting the successful delivery of complex mission-critical projects.
Equal opportunity and legal notices
Apollo challenges the brightest, most talented, and driven individuals in the industry by providing an environment that embraces initiative, diversity, and achievement. We are an Equal Employment Opportunity, Affirmative Action employer supporting women, minorities, veterans and people with disabilities. We participate in the Department of Homeland Security E-Verify program.
From Apollomce's careers page, posted on November 23, 2026, first listed on Rolev.ai on November 25, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Data Center Constructions Scheduler - Mission Critical Projects (TX/GA) role at Apollomce, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
Common questions
Where is the Data Center Constructions Scheduler - Mission Critical Projects (TX/GA) job at Apollomce located?
Yes, this Data Center Constructions Scheduler - Mission Critical Projects (TX/GA) opening at Apollomce is listed as Remote (US). Always check Apollomce's application page for specific state eligibility or relocation policies.
How do I apply for the Data Center Constructions Scheduler - Mission Critical Projects (TX/GA) position at Apollomce?
This listing links directly to Apollomce's BambooHR application page. You can apply directly on Apollomce's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the BambooHR application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.