Sb Energy
Direct Greenhouse career site

Electrical Lead, Data Center Construction

Location
Lubbock, TX
Listed
Today

About the role

Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.

Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth.

SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.

SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future-today.

Come join us in accelerating the energy and infrastructure transition!

Basic Function

Leadership of the datacenter construction team is committed to offering every team member an opportunity to engage your core skills and knowledge, while helping each person develop new and valuable skills throughout the duration of the project.

The Electrical Lead is responsible for managing all electrical power infrastructure aspects of hyperscale data center projects from construction through commissioning and turnover. This role ensures that electrical systems are designed, constructed, tested, and commissioned to meet performance requirements, project budgets, schedules, and long-term operational reliability.

This individual works cross-functionally with internal teams, external design partners, and construction stakeholders to translate design intent into successful project execution.

Responsibilities

  • Manage the electrical scope of work across multiple project phases, including concept design, basis of design, detailed design, construction, and closeout.
  • Coordinate with electrical engineers, utility providers, and Owner stakeholders to define power strategies including: medium- and low-voltage distribution, backup generation systems, UPS systems, and critical power architecture.
  • Review and comment on design deliverables to ensure compliance with Owner standards and tenant specific requirements.
  • Serve as the primary interface between internal teams and external electrical engineering consultants
  • Coordinate electrical scope with mechanical, structural, and commissioning teams to ensure seamless system integration. Review and manage electrical submittals, RFIs, change orders, and field clarifications.
  • Serve as the Owner's on-site electrical representative during construction.
  • Monitor electrical contractor performance for quality, safety, schedule, and cost compliance.
  • Participate in site inspections, testing observations, and progress meetings.
  • Validate electrical pay applications and change order pricin g.
  • Assist with budgeting, cost tracking, forecasting, and procurement support for major electrical equipment.
  • Support development and maintenance of project schedules, focusing on electrical milestones and long-lead equipment.
  • Support commissioning activities including test procedures, system validation, and turnover documentation
  • Coordinate with third-party commissioning agent, contractors, and operations teams.
  • Identify risks related to power delivery, procurement, or constructability and develop mitigation strategies
  • Mentor project engineers and support cross-disciplinary coordination.

Qualifications/Requirements

  • Bachelor's degree in Electrical Engineering or equivalent.
  • 5-10+ years of experience in electrical design, project engineering, or construction management
  • Strong knowledge of HV/MV/LV distribution systems, backup power (generators/UPS), and NFPA, NEC, IEEE, and applicable local codes.
  • Experience reviewing and coordinating with external engineering firms
  • Experience delivering large-scale, mission-critical, industrial or data center projects.
  • Detail oriented with strong problem-solving abilities.

Location: Site-based role in Borden County, Tx (Near Lubbock)

Pay and benefits

The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks-while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.

Our Health & Wellness Benefits

At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:

  • 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
  • 401(k) with Company Match
  • Generous Paid Time Off + 11 Paid Holidays
  • 12 Weeks Paid Parental Leave
  • Life, AD&D & Long-Term Disability Coverage
  • Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
  • Mental, Physical & Social Wellness Support (with company contributions)
  • Flexible Work Arrangements & Hybrid Office Setup Benefits
  • Monthly Reimbursement for Phone, Internet & Data
  • Optional Legal & Pet Insurance Plans
  • Device Purchase Support
  • At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible.
  • We work to serve local communities through volunteering, fundraising, and much more.
  • For example, we're proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training.
  • When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!
  • #LI-ONSITE
  • #LI-AM1
Read the original posting

From Sb Energy's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Electrical Lead, Data Center Construction role at Sb Energy, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Electrical Lead, Data Center Construction job at Sb Energy located?

This Electrical Lead, Data Center Construction position at Sb Energy is located in Lubbock, TX. Always check Sb Energy's application page for specific state eligibility or relocation policies.

How do I apply for the Electrical Lead, Data Center Construction position at Sb Energy?

This listing links directly to Sb Energy's Greenhouse application page. You can apply directly on Sb Energy's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Greenhouse application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.