Sb Energy
Direct Greenhouse career site

Mechanical Lead, Data Center Construction

Location
Texas
Listed
Today

About the role

Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.

Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth.

SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.

SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future-today.

Come join us in accelerating the energy and infrastructure transition!

Basic Function

Leadership of the datacenter construction team is committed to offering every team member an opportunity to engage your core skills and knowledge, while helping each person develop new and valuable skills throughout the duration of the project.

The Mechanical Lead is responsible for managing and coordinating all mechanical systems across data center construction projects. This role ensures that mechanical infrastructure is designed, constructed, tested and delivered to meet performance requirements, redundancy targets, and long-term operational reliability.

This individual works cross-functionally with internal teams, external design partners, and construction stakeholders to translate design intent into successful project execution.

Responsibilities

  • Manage the mechanical scope of work across all project phases including concept design, basis of design, detailed design, construction, and closeout.
  • Serve as the primary interface between internal teams and external mechanical engineering consultants
  • Coordinate with mechanical engineers and consultants on: cooling plant strategies, chilled water and/or refrigerant -based systems, CRAH/CRAC units and in-row cooling, pumping, piping, and heat rejection systems.
  • Review design deliverables for compliance w ith Owner standards, codes, constructability, and lifecycle considerations.
  • Serve as the Owner's representative for all mechanical systems during construction.
  • Review and manage mechanical submittals, RFIs, change orders, and field clarifications.
  • Monitor contractor performance related to safety, quality, schedule, and cost.
  • Participate in site walks, inspections, and quality audits.
  • Validate mechanical pay applications and change order pricing.
  • Coordinate mechanical scope with electrical, structural, and commissioning teams to ensure seamless system integration
  • Support commissioning activities including test procedures, system validation, and turnover documentation
  • Support detailed project schedules with emphasis on mechanical milestones and long-lead equipment procurement.
  • Assist with mechanical cost estimating, budget management, and forecasting.
  • Identify technical, constructability, or procurement risks impacting mechanical scope and develop mitigation strategies.
  • Provide mentorship and technical guidance to proje ct engineers.

Qualifications/Requirements

  • Bachelor's degree in related field.
  • 5-10+ years of experience in mechanical engineering, project engineering, or construction management
  • Strong knowledge of data center cooling systems and thermal management, hydronic systems, piping, pumping, HVAC controls and sequences of operations, and reliability best practices.
  • Experience reviewing and coordinating with external engineering firms
  • Experience delivering large-scale, mission-critical, industrial or data center projects.
  • Strong communication and cross-functional collaboration skills

Location: Site-based role in Borden County, TX (Near Lubbock)

Pay and benefits

The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks-while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.

Our Health & Wellness Benefits

At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:

  • 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
  • 401(k) with Company Match
  • Generous Paid Time Off + 11 Paid Holidays
  • 12 Weeks Paid Parental Leave
  • Life, AD&D & Long-Term Disability Coverage
  • Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
  • Mental, Physical & Social Wellness Support (with company contributions)
  • Flexible Work Arrangements & Hybrid Office Setup Benefits
  • Monthly Reimbursement for Phone, Internet & Data
  • Optional Legal & Pet Insurance Plans
  • Device Purchase Support
  • At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible.
  • We work to serve local communities through volunteering, fundraising, and much more.
  • For example, we're proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training.
  • When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!
  • #LI-ONSITE
  • #LI-AM1
Read the original posting

From Sb Energy's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Mechanical Lead, Data Center Construction role at Sb Energy, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Mechanical Lead, Data Center Construction job at Sb Energy located?

This Mechanical Lead, Data Center Construction position at Sb Energy is located in Texas. Always check Sb Energy's application page for specific state eligibility or relocation policies.

How do I apply for the Mechanical Lead, Data Center Construction position at Sb Energy?

This listing links directly to Sb Energy's Greenhouse application page. You can apply directly on Sb Energy's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Greenhouse application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.