Pre-Lease Senior Cost Manager - Data Center Construction
- Location
- Remote (US)
- Listed
- Today
How well does your resume fit this job?
Upload your resume to see your score for this Turner & Townsend role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
About the role
Turner & Townsend is seeking an experienced Pre-Lease Senior Cost Manager to provide an independent cost view on data center deals from intake to lease execution. The role validates budgets, challenges developer numbers with a prepared view, reviews Cost Reimbursement Agreement (CRA) exhibits and expenses where applicable, and hands a clear cost position to delivery at lease. Our client makes the calls; the Pre-Lease Cost Manager makes sure they are informed calls.
Responsibilities
Intake to letter of intent (LOI) and CRA
- Produce a high-level dollars per megawatt ($/MW) budget and rough order of magnitude (ROM) before the developer's numbers arrive, and use it as the first test of every developer number.
- Join every deal call with notes; bring the context behind each cost review to the Pre-Lease Senior Program Manager.
- Set up the CRA exhibit where applicable, validate it, and pre-approve Expense Item Requests (EIRs); review every CRA and EIR claim against backup before spend is charged, within three business days.
- Review the developer's preliminary budget and scope split (owner-furnished vs lease scope) on each iteration, and run two to three budget challenge rounds or workshops with the developer's cost team.
- Issue the cost narrative (caps, cash flow, termination exposure) and contribute cost grades and entries to the Risk Exposure Log within 24 hours.
Lease execution and handover
- Bound the build cost and confirm the cost position at lease: budget, CRA position and open items, handed to Delivery and carried into the owner's cost report after lease.
- Review the general contractor (GC) procurement and delivery model as the design matures; flag ROM-to-guaranteed maximum price (GMP) drift early and maintain a cash-flow look-ahead.
- Build the portfolio cost forecast model inputs and, with the delivery team, hand over cost position and open items at the handover meeting.
Reporting and benchmarking
- Report weekly CRA status and provide an auditable backup pack to our client's finance team on request.
- Tag every deal to the work breakdown structure (WBS) Level 3 benchmark and $/critical MW entry; own global cost benchmarking across the portfolio.
- Maintain program-wide cost templates and the one-record standard; perform quality assurance/quality control (QA/QC) and cover a colleague's deals.
- Cover about six pre-lease deals (about 5.5 at full weight) alongside the Pre-Lease Senior Program Managers.
- Review the CRA exhibit, not the language: cost, scope and exposure only.
- Operate within the pre-lease scope boundary: coordinate, validate and synthesize, with our client making the calls. Do not negotiate LOI, CRA or lease terms, review legal language, give legal or commercial advice, or make deal decisions.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Project/Program specifications
- Project/Program specific responsibilities: Pre-lease cost management for data center deals: ROM and $/MW budget, CRA and EIR review, developer budget review, benchmarking, cost position at lease and weekly CRA status.
- Market sector experience: Data center and mission-critical construction cost management; owner-side or consultancy.
- Software specific requirements: Excel (advanced), Power BI or equivalent, cost management and forecasting tools; developer budget and cost-report formats.
- Certification requirements: Royal Institution of Chartered Surveyors (RICS), Association for the Advancement of Cost Engineering (AACE) or equivalent preferred.
- Deal load: about six pre-lease deals, shared with one Pre-Lease Schedule Manager across a pair of Pre-Lease Senior Program Managers.
- Work location: Regional hub (Northern Virginia, Dallas, San Francisco or Canada) with visits to developer sites as needed.
Qualifications & Requirements
- Bachelor's degree in construction management, cost management, quantity surveying, engineering or field related to construction.
- Minimum 5-7 years of relevant experience working in a cost management role in the construction industry.
- RICS accredited or working towards it is preferred.
- Experience of leading cost management on medium or large sized construction projects of medium to high complexity.
- Construction consultancy experience is strongly preferred.
- Good knowledge of construction industry technical matters, such as different procurement routes, value management, and value engineering.
- Excellent communication skills.
Additional Information
*On-site presence and requirements may change depending on our client's needs.
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
All your information will be kept confidential according to EEO guidelines.
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
About the Company
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programmes as we turn challenge into opportunity and complexity into success.
Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world.
Equal opportunity and legal notices
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
From Turner & Townsend's careers page, first listed on Rolev.ai on November 20, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Pre-Lease Senior Cost Manager - Data Center Construction role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Common questions
Where is the Pre-Lease Senior Cost Manager - Data Center Construction job at Turner & Townsend located?
Yes, this Pre-Lease Senior Cost Manager - Data Center Construction opening at Turner & Townsend is listed as Remote (US). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.
How do I apply for the Pre-Lease Senior Cost Manager - Data Center Construction position at Turner & Townsend?
This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.