Actalent
Cloud Infrastructure & DevToolsDirect employer career site

QA/QC Electrical Specialist | Data Center Construction

Location
Port Washington, WI · On-site
Job type
Full-time
Level
Mid-level
Posted
Yesterday

Skills & highlights for this role

  • electrical installation inspection
  • quality assurance
  • code compliance verification

Also useful

  • data center construction
Free · No account needed

How well does your resume fit this job?

Upload your resume to see your score for this Actalent role, what matches, what's missing, and your best other matches.

Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.

About the role

We are looking for a QA/QC Electrical Specialist to ensure that all electrical installations meet quality standards in mission-critical data center projects. This role involves daily inspections, compliance verification, and collaboration with project managers to maintain high reliability and quality expectations.

Location: Port Washington, Wisconsin, USA.

Read the original posting

From Actalent's careers page, posted on November 20, 2026, first listed on Rolev.ai on November 22, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this QA/QC Electrical Specialist | Data Center Construction role at Actalent, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the QA/QC Electrical Specialist | Data Center Construction job at Actalent located?

This QA/QC Electrical Specialist | Data Center Construction position at Actalent is located in Port Washington, WI (On-site). Always check Actalent's application page for specific state eligibility or relocation policies.

What qualifications are required for QA/QC Electrical Specialist | Data Center Construction at Actalent?

For the QA/QC Electrical Specialist | Data Center Construction role, Actalent highlights experience with electrical installation inspection, quality assurance, code compliance verification. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the QA/QC Electrical Specialist | Data Center Construction position at Actalent?

This listing links directly to Actalent's application page. You can apply directly on Actalent's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.