Cumming Group
Direct Workday career site

QA/QC Manager - Data Center Construction

Pay
$104,600 – $139,467 per year
Location
Fort Worth, TX · On-site
Job type
Full-time
Level
Lead / Staff
Experience
6+ years
Listed
Today

Skills & highlights for this role

  • Quality control management or industrial building inspection
  • Construction quality assurance and QC plan development
  • Mechanical, electrical, and process inspection and testing
  • QA/QC CPM scheduling knowledge
  • Interpreting contract requirements, drawings, and specifications
  • Quality documentation management
  • Stakeholder communication with contractors and owners

Also useful

  • Data center construction experience
  • Industrial or semiconductor facility experience
  • Commissioning and turnover experience
  • Knowledge of AHJ and applicable building codes

Responsibilities

  • Develop, implement, and maintain the project-wide QA/QC plan in alignment with semiconductor facility standards.
  • Establish inspection and testing protocols for mechanical, electrical, structural, and equipment installations.
  • Lead quality meetings with contractors, engineering teams, and the owner.
  • Manage the project's quality documentation structure (DWNs, NCRs, RFIs, QA logs, closeout document requirements).
  • Observes commissioning meetings and updates senior project management on project commissioning progress, targets, and risk elements
  • Collaboration with project construction teams to fine tune the construction schedule and integrate all the necessary equipment and system components to meet pre-requisites for equipment tagging.
  • Verifies that the General Contractors uphold obligations with respect to their commissioning and quality program deliverables.
  • Ensures equipment maintenance via the Construction Manager is upheld until handover.
  • Maintains the warranty program and follows up on completion of warranty tasks.
  • Review documentation for completeness and compliance with best quality practices and in accordance with AHJ, General Contractor and owner requirements.
  • Perform all activities in a safe and responsible manner and support all Environmental, Health, Safety, Security requirements, and programs.
  • Coordinate with the owner on all quality matters.
  • Prior to the start of construction, meet with the owner or authorized representative to review the details of the contractor's Quality Control Plan's components, forms, control activities, testing and any other items to ensure a complete and mutual understanding of the QC plan and procedures and alignment with the site Quality Assurance Plan and project specifications
  • Participate in internal and external site audits
  • Monitor the implementation of the approved site Quality Assurance Plan
  • Coordinate with the site construction lead on all quality issues and provide technical support to resolve quality issues.
  • Assure all technical documents related to site quality control are utilized
  • Manage Owner's 3rd Party Special Inspection Agencies

Requirements

  • Minimum 6 years of construction experience and quality control management or industrial Building Inspector experience, ideally in data center or industrial projects.
  • General knowledge of other applicable codes and standards.
  • Knowledge of QAQC CPM scheduling in the construction environment.
  • Have experience with interpreting and enforcing contract requirements, drawings, specifications and applicable codes.
  • Demonstrated proficiency and experience with the following tools: Microsoft Office software. Experience with document control and commissioning software programs would be beneficial.

Education & Certifications

  • Bachelor's degree in construction management, architecture or engineering, or related field preferred
  • Equivalent experience in the field will be considered in lieu of formal education.

#LI-VM1

Pay and benefits

The salary range for this full-time role is $104,600.00-$139,466.68 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.

Benefits

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program

About Cumming Group

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 10 rankings in ENR. With over 60 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!

We are seeking a highly skilled and motivated QA/QC Manager to be part of our team in Fort Worth, TX.

The QA/QC Manager for Data Center Construction will oversee all quality assurance and quality control functions for a major new build data center project. This role ensures construction meets mechanical, electrical, and process requirements while maintaining full compliance with owner's standards and specifications. You may lead a team of discipline specific quality inspectors, manage documentation, coordinate with contractors, and support turnover and commissioning activities.

The successful candidate must be self-motivated, technically skilled, highly organized, communicate clearly and have a proven ability to work in a fast-paced dynamic environment. Candidates' work history must represent increased levels of responsibility on a progressive basis throughout their career.

A relocation package may be available for outstanding candidates.

Read the original posting

From Cumming Group's careers page, first listed on Rolev.ai on November 17, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this QA/QC Manager - Data Center Construction role at Cumming Group, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the QA/QC Manager - Data Center Construction role at Cumming Group?

The QA/QC Manager - Data Center Construction posting at Cumming Group states compensation of $104,600 – $139,467 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on Cumming Group's official career site.

Where is the QA/QC Manager - Data Center Construction job at Cumming Group located?

This QA/QC Manager - Data Center Construction position at Cumming Group is located in Fort Worth, TX (On-site). Always check Cumming Group's application page for specific state eligibility or relocation policies.

What qualifications are required for QA/QC Manager - Data Center Construction at Cumming Group?

For the QA/QC Manager - Data Center Construction role, Cumming Group highlights 6+ years of relevant experience; experience with Quality control management or industrial building inspection, Construction quality assurance and QC plan development, Mechanical, electrical, and process inspection and testing, QA/QC CPM scheduling knowledge, Interpreting contract requirements, drawings, and specifications, Quality documentation management. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the QA/QC Manager - Data Center Construction position at Cumming Group?

This listing links directly to Cumming Group's Workday application page. You can apply directly on Cumming Group's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.