Medcor Inc.
Direct employer career site

Safety Professional – Data Center Construction (Short-Term Project)

Location
The Dalles OR, Hood River OR
Listed
Today
Free · No account needed

How well does your resume fit this job?

Upload your resume to see your score for this Medcor Inc. role, what matches, what's missing, and your best other matches.

Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.

About the role

Location: The Dalles, OR

Compensation

$45.00/hour (W2)

Per Diem: $980/week

Schedule: Monday–Friday, 4:00 PM – 2:00 AM | Approximately 50 hours per week

  • Anticipated Start Date: Mid-December 2026
  • Project Duration: Approximately 4–5 months
  • Project Type: Data Center Construction (General Contractor)

Position Overview

Medcor Safety, a subsidiary of Medcor, is seeking an experienced

Safety Professional for a short-term data center construction project in

The Dalles, Oregon.

This position will support onsite safety operations, identify and mitigate workplace hazards, and work closely with construction crews, subcontractors, and project leadership to maintain a safe and compliant work environment.

The ideal candidate will have a strong background in construction safety, excellent communication skills, and the ability to work independently in a fast-paced construction environment. Previous experience supporting large-scale commercial, industrial, or data center construction projects is highly desirable.

Key Responsibilities

  • Conduct regular site safety inspections and audits to identify potential hazards and unsafe work practices.
  • Work collaboratively with field personnel, subcontractors, and project management to address safety concerns and implement corrective actions.
  • Monitor compliance with OSHA regulations, site-specific safety plans, and applicable federal, state, and local requirements.
  • Review and maintain safety documentation, inspection reports, and employee training records.
  • Participate in safety meetings, project kickoff meetings, and daily safety discussions.
  • Assist with the development and implementation of site-specific safety plans and procedures.
  • Support incident investigations, accident reporting, and corrective action recommendations.
  • Review client and general contractor safety requirements to ensure compliance throughout the project.
  • Promote a proactive safety culture through employee engagement, coaching, and ongoing communication.
  • Maintain positive working relationships with site leadership, construction crews, and outside agencies.

Required Qualifications

Minimum of

  • 5 years of relevant construction safety experience.
  • OSHA 30-Hour Construction certification required.
  • Current CPR/First Aid certification required.
  • Strong understanding of OSHA construction standards and jobsite safety practices.
  • Experience conducting site inspections, safety audits, and incident investigations.
  • Excellent written and verbal communication skills.
  • Ability to work independently and effectively with construction teams and project leadership.
  • Proficiency with Microsoft Office, including Word, Excel, and email.
  • Ability to work the designated afternoon/evening schedule.

Preferred Qualifications

  • Construction Health and Safety Technician (CHST) certification.
  • OSHA 500 certification.
  • Previous experience supporting data center construction projects.
  • Experience working on large-scale commercial or industrial construction sites.
  • Familiarity with general contractor safety programs and site-specific compliance requirements.

Physical Requirements

  • This position requires regular walking and standing throughout an active construction site, as well as bending, squatting, climbing stairs and ladders, and working on elevated platforms.
  • Candidates must be able to lift up to 50 pounds occasionally and possess the visual and physical abilities necessary to perform jobsite safety inspections.

EOE/M/F/Vet/Disability

#indeedsponsored

Why Join Medcor Safety?

Medcor Safety provides experienced safety professionals to construction and industrial projects across the country. Our team works alongside leading contractors to support safe working environments and maintain high standards of workplace safety.

This opportunity offers competitive hourly compensation, weekly per diem, and the ability to contribute to a large-scale data center construction project.

Medcor is a tobacco-free and smoke-free workplace.

Read the original posting

From Medcor Inc.'s careers page, first listed on Rolev.ai on November 28, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Safety Professional – Data Center Construction (Short-Term Project) role at Medcor Inc., it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Safety Professional – Data Center Construction (Short-Term Project) job at Medcor Inc. located?

This Safety Professional – Data Center Construction (Short-Term Project) position at Medcor Inc. is located in The Dalles OR, Hood River OR. Always check Medcor Inc.'s application page for specific state eligibility or relocation policies.

How do I apply for the Safety Professional – Data Center Construction (Short-Term Project) position at Medcor Inc.?

This listing links directly to Medcor Inc.'s application page. You can apply directly on Medcor Inc.'s site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.