Sundt Construction
Direct employer career site

Scheduling Manager - Data Center Construction

Location
Irving, TX
Posted
32 days ago
Free · No account needed

How well does your resume fit this job?

Upload your resume to see your score for this Sundt Construction role, what matches, what's missing, and your best other matches.

Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.

Job Summary

The Scheduling Manager provides technical assistance in creating and updating CMP schedules at all phases of each project throughout their duration, from conceptual states to project closeout and may be involved in the development of proposal level schedules for project pursuits. The Scheduling Manager will be Sundt's in?house scheduling expert, coordinating the CPM schedule creation and updating tasks with the project team.

They will assist project teams with initial schedule development, conduct peer reviews of project schedules, and assist in schedule updating, troubleshooting and revisions throughout the life of a project as needed by the project team. The Manager will be responsible for customizing reports and other modifications inside of the Primavera application to adhere to the Sundt Way.

Key Responsibilities

  • Assist the project teams with the incorporation into the CPM schedule the effects from design conflicts and clarifications.
  • Assists in the development of claims by providing analysis of the project CPM schedule performance.
  • Assists the project team with the management of the CPM schedule for the successful execution of the work, including the coordination of the means and methods, manpower, equipment and material resources required to accomplish this goal.
  • Conducts project CPM schedule review meetings at each of proposal, baseline and update phase.
  • Develops proposal phase CPM schedules from project information provided by the estimating team and historical database.
  • Ensures that project teams are developing project schedules in accordance with Sundt Way Policies and verifies that project teams are complying with project specification requirements.
  • May assist the Talent Development department with the creation of online classes. Will teach Primavera P6 classes in person or utilizing distance learning technologies when appropriate.
  • May supervise staff including: establishing and communicating performance feedback, determining training and development needs and conducting on?the?job training. May conduct Individual Development Reviews.
  • Responsible for the setup of new jobs and schedule template within the Primavera system.

Minimum Job Requirements

  • Excellent facilitation and leadership skills with proven ability to successfully facilitate cross?functional teams and build strong working relationships throughout all levels of an organization.
  • E?ective communicator with excellent inter?personal skills capable of clearly communicating business objectives to a technical and non?technical audience.
  • Minimum 5 years continuous experience with SureTrak, P3, P5, or P6 applications and a Minimum of 7?

10 years of construction jobsite experience (construction scheduling and sequencing).

  • Must be capable of working with minimal supervision, handling multiple projects or assignments and diffusing confrontational situations and keeping groups focused and on task.
  • Positive attitude, flexible problem solver with excellent analytical, communication and organizational skills.
  • Proficient in use of current Microsoft desktop operating systems, Microsoft Office 2007 suite, and Microsoft Visio.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

  • May stoop, kneel, or bend, on an occasional basis
  • Must be able to comply with all safety standards and procedures
  • Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
  • Will interact with people and technology frequently during a shift/work day
  • Will lift, push or pull objects pounds on an occasional basis
  • Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
  • Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

Benefit list

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program

Notice to External Search Firms

Sundt Construction's Talent Acquisition team is the only authorized department to engage with and execute agreements on behalf of the company with external search firms, staffing agencies, and other third-party recruiting partners. Sundt Construction does not accept unsolicited candidate submissions. We will only consider candidates submitted by agencies that have a fully executed agreement with Sundt Construction on file prior to the candidate's submission.

Any candidate submitted without an active, fully executed agreement will not be considered a qualified referral, and Sundt Construction assumes no obligation to pay any placement or recruiting fees. Additionally, any unsolicited resumes submitted to any Sundt Construction employee—including hiring managers or other personnel—will be deemed the property of Sundt Construction without any obligation to the submitting agency.

About the company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Read the original posting

From Sundt Construction's careers page, posted on October 27, 2026, first listed on Rolev.ai on November 25, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Scheduling Manager - Data Center Construction role at Sundt Construction, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Scheduling Manager - Data Center Construction job at Sundt Construction located?

This Scheduling Manager - Data Center Construction position at Sundt Construction is located in Irving, TX. Always check Sundt Construction's application page for specific state eligibility or relocation policies.

How do I apply for the Scheduling Manager - Data Center Construction position at Sundt Construction?

This listing links directly to Sundt Construction's application page. You can apply directly on Sundt Construction's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.