Coreweave
Direct Greenhouse career site

Senior Construction Manager - Data Center Construction

Location
West Chicago, IL
Listed
Today

What You'll Do

You will be a key leader within CoreWeave's Construction Services and Program Management team, driving the successful delivery of hyperscale data center construction projects across our global portfolio.

About the role

As a Senior Data Center Construction Project Manager, you will serve as CoreWeave's on-site owner's representative, leading construction projects from pre-construction through close-out. You will oversee general contractors, manage contracts, and ensure projects are delivered in alignment with design specifications, budgets, master schedules, and committed Ready-for-Service (RFS) dates.

You will have a strong focus on the coordination and commissioning of MEP and low-voltage systems and will travel regularly to project sites to validate construction progress, verify work quality, and proactively identify and address schedule, cost, and delivery risks. You will drive projects toward successful completion while providing leadership with regular updates on progress, financials, risks, and overall project status.

Who You Are

  • B.S. or B.A. degree in Construction, Architecture, Engineering, or a related field.
  • A minimum of 7 years of construction project management experience.
  • A minimum of 3 years of direct experience managing data center construction projects with a strong emphasis on MEP (Mechanical, Electrical, Plumbing) systems.
  • Demonstrated experience managing projects with a contract value of $100M+.
  • Deep understanding of data center infrastructure, including power distribution, cooling systems, and redundancy protocols.
  • Knowledge of construction components, processes, methodologies, and cost estimation.
  • Experience with web-based project management software.
  • A valid driver's license with no significant MVA points/violations.
  • Experience conducting on-site progress inspections and verifying contractor work against drawings, specifications, and the master schedule.

Preferred

  • PMP (Project Management Professional) Certification
  • LEED AP (Leadership in Energy and Environmental Design Accredited Professional) Certification
  • Direct experience with electrical and low-voltage equipment coordination, commissioning, or quality assurance.

Wondering if you're a good fit?

We believe in investing in our people, and value candidates who can bring their own diversified experiences to our teams - even if you aren't a 100% skill or experience match. Here are a few qualities we've found compatible with our team. If some of this describes you, we'd love to talk.

  • You love to take ownership and drive complex, technical projects from start to finish.
  • You're curious about building the critical infrastructure that powers the future of computing.
  • You're an expert in managing large-scale construction budgets, schedules, and contracts in mission-critical environments.

What We Offer

  • The range we've posted represents the typical compensation range for this role.
  • To determine actual compensation, we review the market rate for each candidate which can include a variety of factors.
  • These include qualifications, experience, interview performance, and location.
  • In addition to a competitive salary, we offer a variety of benefits to support your needs.
  • The benefits below reflect our US-based offerings for full-time employees; for roles in other locations, benefits vary and are shared during the hiring process.
  • These include:
  • Medical, dental, and vision insurance - 100% paid for by CoreWeave
  • Company-paid Life Insurance
  • Voluntary supplemental life insurance
  • Short and long-term disability insurance
  • Flexible Spending Account
  • Health Savings Account
  • Tuition Reimbursement
  • Ability to Participate in Employee Stock Purchase Program (ESPP)
  • Mental Wellness Benefits through Spring Health
  • Family-Forming support provided by Carrot
  • Paid Parental Leave
  • Flexible, full-service childcare support with Kinside
  • 401(k) with a generous employer match
  • Flexible PTO
  • Catered lunch each day in our office and data center locations
  • A casual work environment
  • A work culture focused on innovative disruption
  • California Applicants
  • California Consumer Privacy Act

About Coreweave

CoreWeave is The Essential Cloud for AI™. Built for pioneers by pioneers, CoreWeave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, CoreWeave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, CoreWeave became a publicly traded company (Nasdaq: CRWV) in March 2025.

Why Coreweave?

At CoreWeave, we work hard, have fun, and move fast! We're in an exciting stage of hyper-growth that you will not want to miss out on. We're not afraid of a little chaos, and we're constantly learning. Our team cares deeply about how we build our product and how we work together, which is represented through our core values:

  • Be Curious at Your Core
  • Act Like an Owner
  • Empower Employees
  • Deliver Best-in-Class Client Experiences
  • Achieve More Together

We support and encourage an entrepreneurial outlook and independent thinking. We foster an environment that encourages collaboration and enables the development of innovative solutions to complex problems. As we get set for takeoff, the organization's growth opportunities are constantly expanding. You will be surrounded by some of the best talent in the industry, who will want to learn from you, too. Come join us!

The base salary range for this role is $143,000 to $210,000. The starting salary will be determined by job-related knowledge, skills, experience, and the market location. We strive for both market alignment and internal equity when determining compensation. In addition to base salary, our total rewards package includes a discretionary bonus, equity awards, and a comprehensive benefits program (all based on eligibility).

Read the original posting

From Coreweave's careers page, first listed on Rolev.ai on November 12, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Senior Construction Manager - Data Center Construction role at Coreweave, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Senior Construction Manager - Data Center Construction job at Coreweave located?

This Senior Construction Manager - Data Center Construction position at Coreweave is located in West Chicago, IL. Always check Coreweave's application page for specific state eligibility or relocation policies.

How do I apply for the Senior Construction Manager - Data Center Construction position at Coreweave?

This listing links directly to Coreweave's Greenhouse application page. You can apply directly on Coreweave's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Greenhouse application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.