Parsons
Direct Workday career site

Senior Construction Scheduler

Location
United States
Listed
3 days ago

About the role

In a world of possibilities, pursue one with endless opportunities. Imagine Next!

At Parsons, you can imagine a career where you thrive, work with exceptional people, and be yourself. Guided by our leadership vision of valuing people, embracing agility, and fostering growth, we cultivate an innovative culture that empowers you to achieve your full potential. Unleash your talent and redefine what's possible.

About the role

Parsons is seeking a Scheduler to join our Owner's Advisor team supporting the Medical Enlisted Training Campus (METC) Recapitalization Program at Joint Base San Antonio-Fort Sam Houston. This mission-critical initiative will deliver five modern dormitory facilities for up to 6,000 joint-service medical students and the associated infrastructure.

Working alongside government leaders, military stakeholders, designers, and contractors, you will help manage risk, protect the government's interests, and support the successful delivery of a high-profile Progressive Design-Build program. This is a unique opportunity to contribute to a landmark campus, advance innovative delivery methods, and help shape the future of large-scale Air Force infrastructure programs.

What You'll Be Doing

  • Develop independent schedule analysis and integrated forecasting across design, manufacturing, shipping, construction, utilities, and acceptance.
  • Give program leadership clear evidence of constraints and realistic recovery options.
  • Review and maintain the owner's integrated schedule model aligned to the approved contractor schedule and milestones.
  • Validate logic, calendars, durations, critical paths, resources, float, and links between factories and site work fronts.
  • Analyze production quantities and rates using consistent units for beds, rooms, modules, shipments, and crane lifts.
  • Integrate field progress, look-ahead constraints, utility readiness, and commissioning prerequisites into forecasts.
  • Perform schedule risk and what-if analysis; evaluate change impacts and proposed recovery sequencing.
  • Prepare concise schedule narratives, variance reports, decision deadlines, and milestone confidence assessments.

What Required Skills You'll Bring

  • Must be a US Citizen
  • Bachelor's degree in Construction Management, Engineering, Architecture, Business, or related field; 4 addition years of relevant experience will substitute for a degree.
  • 10+ years of experience in scheduling for construction projects or federal contracting operations.
  • Proficiency in Primavera P6 or equivalent CPM scheduling software and advanced spreadsheet analysis.
  • Strong understanding of construction sequencing, critical path method (CPM), and project controls.
  • Experience supporting utility, construction, or infrastructure projects preferred
  • Strong understanding of scheduling logic, resource planning, and cost integration
  • Strong communication and collaboration skills in a cross-functional environment
  • Ability to manage multiple priorities in a deadline-driven setting
  • Excellent analytical, problem-solving, and communication skills.
  • Ability to obtain and maintain unescorted access to JBSA Fort Sam Houston.
  • Ability to maintain a one team mentality amongst all stakeholders.

What Desired Skills You'll Bring

  • Experience project scheduling for large scale Federal or DoD construction projects
  • Former Military Construction/Engineering experience a plus
  • Experience performing 14-point schedule assessment or similar schedule quality reviews
  • AACE PSP or PMI-SP credential; quantitative schedule risk modeling experience.
  • Federal design-build, factory production/logistics, five-building or comparable concurrent campus delivery, and commissioning schedules.

Security Clearance Requirement

None

This position is part of our Federal Solutions team.

The Federal Solutions segment delivers resources to our US government customers that ensure the success of missions around the globe. Our intelligent employees drive the state of the art as they provide services and solutions in the areas of defense, security, intelligence, infrastructure, and environmental. We promote a culture of excellence and close-knit teams that take pride in delivering, protecting, and sustaining our nation's most critical assets, from Earth to cyberspace. Throughout the company, our people are anticipating what's next to deliver the solutions our customers need now.

Salary Range

$103,500.00 - $181,100.00

We value our employees and want our employees to take care of their overall wellbeing, which is why we offer best-in-class benefits such as medical, dental, vision, paid time off, Employee Stock Ownership Plan (ESOP), 401(k), life insurance, flexible work schedules, and holidays to fit your busy lifestyle!

We truly invest and care about our employee's wellbeing and provide endless growth opportunities as the sky is the limit, so aim for the stars! Imagine next and join the Parsons quest-APPLY TODAY!

Parsons is aware of fraudulent recruitment practices. To learn more about recruitment fraud and how to report it, please refer to

Read the original posting

From Parsons's careers page, first listed on Rolev.ai on November 6, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Senior Construction Scheduler role at Parsons, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Senior Construction Scheduler job at Parsons located?

This Senior Construction Scheduler position at Parsons is located in United States. Always check Parsons's application page for specific state eligibility or relocation policies.

How do I apply for the Senior Construction Scheduler position at Parsons?

This listing links directly to Parsons's Workday application page. You can apply directly on Parsons's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.