Senior Construction Scheduler - Federal Sector
- Location
- Washington, DC (Remote)
- Posted
- 38 days ago
How well does your resume fit this job?
Upload your resume to see your score for this Procon Consulting role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
About the role
Procon is a top-ranked construction management and technology consulting firm with 25 years of experience delivering high‑impact projects across the U.S. and worldwide. An ENR Top 100 CM/PM firm for five consecutive years, we specialize in program management, project controls, commissioning, and technology—and offer an excellent platform to grow your career while shaping the future of the built environment.
Procon seeks a Senior Scheduler. This role requires various skills and experience as listed below.
This position does not offer employment visa sponsorship. Candidates must be authorized to work in the United States without current or future sponsorship.
Qualifications and Skills
- Expertise in Primavera P6 with demonstrated proficiency in building and analyzing Critical Path Method (CPM) schedules.
- Minimum of 10 years of experience in construction scheduling, with a strong track record in CPM methodologies.
- Deep understanding of federal government construction processes, including contracts, design documents, and specifications.
- Experience supporting vertical construction, utility, and infrastructure projects.
- Familiarity with large-scale or complex scheduling environments, including development and assessment of Integrated Master Schedules and detailed analysis of TIAs and COs.
- Strong verbal and written communication skills for effective stakeholder engagement and reporting.
- Bachelor’s degree required in construction management, engineering, or a related field.
- Preferred but not required: certifications in scheduling, general contractor experience, and working knowledge of Microsoft Project (MSP), Schedule Validator, Primavera Risk Analysis, or a relevant master’s degree.
Responsibilities and Duties
- Develop and manage complex Integrated Master Schedules (IMS), including look-ahead planning and “what-if” scenario modeling.
- Evaluate construction schedules for compliance, performance, and risk, including thorough assessments of Time Impact Analyses (TIA) and Change Orders (CO).
- Collaborate cross-functionally to align scopes of work across concurrent projects.
- Deliver timely and insightful reporting by synthesizing data from various sources and communicating scheduling impacts across program stakeholders.
- Participate proactively in project lifecycle activities—such as design reviews, procurement strategy sessions, and coordination meetings—to maintain a deep understanding of project and program dynamics.
- Provide onsite support when needed, with occasional travel and the potential to work from alternate project offices in the future.
Benefits
- Salary commensurate with experience.
- Interested and qualified candidates please submit a cover letter and a resume.
Equal opportunity and legal notices
Procon offers competitive salaries and a comprehensive benefits package, including full medical/dental insurance and 401(K) plan. Procon is an equal opportunity employer and considers qualified applicants for employment without regard to race, gender, age, color, religion, disability, veteran status, sexual orientation, or any other protected factor
From Procon Consulting's careers page, posted on October 19, 2026, first listed on Rolev.ai on November 26, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Senior Construction Scheduler - Federal Sector role at Procon Consulting, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
Common questions
Where is the Senior Construction Scheduler - Federal Sector job at Procon Consulting located?
Yes, this Senior Construction Scheduler - Federal Sector opening at Procon Consulting is listed as Washington, DC (Remote). Always check Procon Consulting's application page for specific state eligibility or relocation policies.
How do I apply for the Senior Construction Scheduler - Federal Sector position at Procon Consulting?
This listing links directly to Procon Consulting's Workable application page. You can apply directly on Procon Consulting's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workable application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.