Senior Construction Scheduler (Scheduler III)
- Pay
- $170,000 – $210,000 per year
- Location
- United States · On-site
- Job type
- Full-time
- Level
- Senior
- Experience
- 7+ years
- Education
- Bachelor's degree
- Listed
- Today
Skills & highlights for this role
- Primavera P6
- CPM scheduling
- OSHPD compliance
- DCMA 14-point assessment
Also useful
- Last Planner System
- Acumen Fuse
- Oracle Primavera Cloud
Compensation
Full-time, exempt. Base salary range: $170,000 - $210,000.
Rudolph & Sletten, a Tutor Perini Company, is seeking a Scheduler III - Healthcare to join our Project Controls team in the San Francisco / San Jose Bay Area.
About the role
This role leads CPM scheduling on complex healthcare projects in the Bay Area, owning project schedules from baseline through closeout on OSHPD projects, including new acute care facilities, phased renovations of occupied hospitals, and seismic compliance work. This is a senior, client-facing position that works directly with owners, owner's representatives, design teams and OSHPD-related stakeholders, and mentors junior schedulers.
- Develops resource- and cost-loaded baseline schedules in Primavera P6 that meet contract scheduling specifications, sets up WBS, activity coding, calendars and phasing for multi-phase healthcare projects, and gets schedules accepted by owners and their reviewers.
- Runs monthly updates, progress statusing, narratives, and critical path and float analysis; performs schedule quality checks such as the DCMA 14-point assessment; produces schedules for pursuits, preconstruction and proposals as needed.
- Builds OSHPD review and approval durations into the schedule, including plan review, increments, deferred submittals, amended construction documents and change orders; schedules IOR inspections, OSHPD field reviews, testing and inspection, and the steps leading to final sign-off, licensing and occupancy.
- Plans work in occupied, operating hospitals, including ICRA/infection-control requirements, phasing, utility shutdowns, swing space and coordination with facility operations.
- Facilitates pull-planning and phase-scheduling sessions with trade partners and design teams, integrates the results into the master CPM schedule, and supports the full Last Planner cycle: milestone and phase planning, make-ready lookahead and constraint logs, weekly work plans, PPC tracking and variance and root-cause analysis.
- Identifies schedule risks and potential delays early, develops mitigation and recovery strategies with the project team, and prepares recovery and what-if schedules.
- Prepares and defends time impact analyses (TIAs) and fragnets for changes, owner-caused delays and unforeseen conditions; performs delay and acceleration analyses consistent with AACE recommended practices (e.g., 29R-03, 52R-06); supports negotiation of time extensions and resolution of claims.
- Serves as the scheduling point of contact for owners, owner's representatives and design teams, presents schedule status and risk to project and company leadership, mentors and reviews the work of Scheduler I/II staff, and contributes to company scheduling standards.
Requirements
- Bachelor's degree in construction management, engineering, architecture or a related field (or equivalent experience).
- 7+ years of CPM construction scheduling experience, with at least 3 years or 2 completed projects on OSHPD healthcare work (OSHPD 1 acute care hospitals strongly preferred); experience with phased renovations in occupied acute care facilities and hospital seismic compliance projects preferred.
- Expert-level Primavera P6 skills, including baseline development, updates, resource/cost loading and schedule analysis; familiarity with Oracle Primavera Cloud, MS Project, and schedule analysis tools (e.g., Acumen Fuse).
- Hands-on experience facilitating Last Planner System and pull-planning sessions and integrating collaborative plans into CPM schedules; lean construction training or credentials (e.g., LCI Last Planner training, AGC CM-Lean) preferred.
- Demonstrated experience preparing TIAs and delay analyses and presenting or defending them to owners, with strong written and verbal communication skills, including schedule narratives and executive-level reporting.
- Working knowledge of the OSHPD review, inspection and approval process and how it drives healthcare project schedules; experience in IPD, design-assist or design-build healthcare projects and AACE PSP or PMI-SP certification preferred.
Our Vision
We strive to deliver innovative projects while fostering a culture where employees thrive.
Rudolph & Sletten builds extraordinary projects with exceptional talent. Join us and together we will build the future
Equal Opportunity Employer
About Rudolph & Sletten
In the last six decades, Rudolph and Sletten has built thousands of projects across our five California offices, from research centers designed to cure diseases to institutions that educate future generations to civic facilities and high-tech campuses that move our state forward. Just like the buildings we construct, our reputation is built to stand the test of time. Our success is due to our diverse, talented personnel, technological expertise, honest estimates, innovative schedules, and ethical business practices.
We're excited to see where the future takes us. Between new building and construction technology, better earth-friendly materials and techniques, all our phenomenal employees, and the amazing people we work with, we're looking forward to building more award-winning projects for decades to come.
Our client focus and technical expertise have made us a builder of choice for clients for over 6 decades. Notable clients include Johnson and Johnson, Gilead, Salk Institute, Western Digital, Oracle, Seagate, Intuit, San Diego Symphony, Kaiser Permanente, Cedars-Sinai, the Judicial Council of California, and UC and CSU higher education systems.
At Rudolph & Sletten you will have the opportunity to work on a variety of large, high-profile, projects that impact your community.
Extraordinary Projects need Exceptional Talent… Let's Build
Our Mission
We build critical infrastructure that creates a better world.
From Tutor Perini's careers page, first listed on Rolev.ai on November 18, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Senior Construction Scheduler (Scheduler III) role at Tutor Perini, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
- Construction SchedulerMAV Project Services · Phoenix, AZ
- Project SchedulerCumming Group · Los Angeles, CA
- Construction SchedulerPrime Data Centers · Lockhart, TX · $100k – $140k/yr
- Construction SchedulerJRM Construction Management, LLC · Boca Raton, FL
- Construction Scheduling AnalystClark · Reno, NV
- Construction SchedulerHolder Construction · Columbus, OH
Common questions
What is the salary for the Senior Construction Scheduler (Scheduler III) role at Tutor Perini?
The Senior Construction Scheduler (Scheduler III) posting at Tutor Perini states compensation of $170,000 – $210,000 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on Tutor Perini's official career site.
Where is the Senior Construction Scheduler (Scheduler III) job at Tutor Perini located?
This Senior Construction Scheduler (Scheduler III) position at Tutor Perini is located in United States (On-site). Always check Tutor Perini's application page for specific state eligibility or relocation policies.
What qualifications are required for Senior Construction Scheduler (Scheduler III) at Tutor Perini?
For the Senior Construction Scheduler (Scheduler III) role, Tutor Perini highlights 7+ years of relevant experience; a bachelor's degree; experience with Primavera P6, CPM scheduling, OSHPD compliance, DCMA 14-point assessment. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.
How do I apply for the Senior Construction Scheduler (Scheduler III) position at Tutor Perini?
This listing links directly to Tutor Perini's Workday application page. You can apply directly on Tutor Perini's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.