Senior Cost Manager (Data Center Construction)
- Pay
- $130,500 – $174,033 per year
- Location
- New York, NY
- Posted
- Yesterday
How well does your resume fit this job?
Upload your resume to see your score for this Cumming Group role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
Essential Duties & Responsibilities
- Develop detail-level budgets, cost models, and order-of-magnitude estimates from limited design information, narratives, or schematic drawings during early pre-construction phases.
- Project Assessment: Thoroughly evaluate project specifications, plans, and requirements to gain a comprehensive understanding of the project scope and objectives.
- Material Takeoffs: Conduct detailed material takeoffs to quantify the required materials and resources for each project component accurately.
- Cost Estimation: Utilize advanced construction estimating software and industry-standard methodologies to prepare precise cost estimates. This includes labor, materials, equipment, and contractor costs.
- Cost Analysis: Analyze project costs, including direct and indirect expenses, overhead, and profit margins, to determine a competitive yet profitable bid price.
- Competitive Analysis: Research and analyze competitors' bids and pricing strategies to develop competitive and profitable proposals.
- Value Engineering: Collaborate with project teams to explore value engineering options and cost-saving alternatives without compromising project quality.
- Estimate Review: Collaborate with estimating teams to review and refine estimates, ensuring accuracy, completeness, and adherence to company standards.
- Bid Strategy: Develop and execute comprehensive bid strategies, considering factors such as project complexity, market conditions, and client expectations.
- Bid Preparation: Lead the creation of thorough and organized bid packages, ensuring compliance with bid submission requirements, deadlines, and contractual obligations.
- Client Interaction: Engage with clients and project stakeholders to clarify project specifications, answer inquiries, and build positive relationships.
- Review, interpret and accurately estimate the scope of assigned work as described in the project documents.
- Develop and nurture sub-contractor, vendor, and client relationships.
- Lead client accounts.
- Review and comment on contracts and participate in contract negotiation.
- Prepare sub-contractor analysis sheets for assigned scope of work.
- Evaluate changes and subcontractor change order estimates and provide expertise in all phases of construction work.
- Perform Continuous Cost Management.
- Manage contract administration at the project level.
- Partner with management team in developing new customers and growing existing customer base.
- Develop and nurture client relationships to ensure client satisfaction.
- Support senior management by providing needed reports and responding to inquiries for information.
- Mentor associate level cost and commercial managers.
- Prepare project plans.
- Other duties as assigned.
- Attendance at work during normal business hours.
Knowledge & Skills Required
- Understand how your role contributes to the organization's goals.
- Deliver quality work product by role modeling organizational core values.
- Hold self accountable to individual and team goals.
- Consistently communicate and collaborate with team members and clients.
- Build relationships with peers, leaders, and clients.
- Proactively participate in self-development to continually enhance current skills and build new skills required to excel at current role and prepare for career progression.
- Provide pricing expertise in various phases of construction work.
- Strong research skills and ability to allocate the relevant data.
- Exposure to industry events, functions, & creating a network of key AEC professionals in the market.
- Ability to effectively integrate with other departments.
- Ability to quickly analyze, compare, and interpret detailed but sometimes poorly defined information.
- Understand construction technology, economics of construction, construction delivery methodologies, local requirements on tax and insurances as they impact construction costs, ability to understand general conditions and general requirements at a detailed level.
- Understand construction law in the local market, applicable methods of measurement and approaches to parametric, top down and bottoms up estimates.
- Possess a working knowledge of the different roles and services Cumming provides and how the cost management team fits in the project.
- Ability to communicate with various stakeholders, internal and external to the company in a responsive manner.
- Ability to multi-task, prioritize, and work efficiently.
- Ability to perform at high levels in a fast paced, ever-changing work environment.
- Demonstrate consistent management of overall project assigned beyond tasks completion.
- Hold a professional qualification relative to your job role.
Preferred Education and Experience
- Education: Bachelor's degree in Construction, Cost Management, Engineering, Quantity Surveying, or related field.
- Minimum of 7 years' experience in Estimating, Cost Management or Quantity Surveying is required.
- Preferred Certification: MRICS, AssocRICS, CCP, CEP, CPE or equivalent is preferred.
- Experience working on data center and/or mission critical projects is required.
- Proficient in CostX, OST and Microsoft Excel.
Pay and benefits
The salary range for this full-time role is $130,500.00-$174,033.36 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.
Benefits
In addition to base salary, Cumming Group offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
- Company-Paid Parental Leave
- State Paid Family and Medical Leave (where applicable)
- Lifestyle Spending Account (LSA)
- Professional Development & Tuition Assistance
#LI-PJ1
About Cumming Group
At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!
In this role, you will be a member of our highly reputable cost management and estimating team. The cost team delivers solutions to clients in the areas of conceptual estimating, budget development, cost planning, feasibility studies, value management, economic forecasting, milestone reports, pre- and post-contract auditing, change order review and reconciliation, BIM 5D cost modeling, LEED cost analysis, life cycle costing, and more. We encourage you to research us to learn more about our outstanding reputation within this service line.
We are currently hiring for a Senior Cost Manager in New York, NY. In this role, you will have the opportunity to work on data center and/or mission critical projects where you will be heavily involved in a variety of tasks ranging from estimating, cost controls, risk, and overall client management.
Equal opportunity and legal notices
Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices.
It is Cumming Group's policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law.
All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
From Cumming Group's careers page, posted on November 23, 2026, first listed on Rolev.ai on November 24, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Senior Cost Manager (Data Center Construction) role at Cumming Group, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
- Senior Cost AccountantAston Carter · Medley, FL
- Senior Cost/Price AnalystV2X · United States
- Senior Cost EngineerBechtel · New Albany, OH
- Senior Cost Manager / Quantity Surveyor - Construction ManagementTurner & Townsend · Atlanta, GA
- Senior Cost Manager / Quantity Surveyor - Data Center ConstructionTurner & Townsend · Fort Wayne, IN
- Senior Cost Manager / Quantity Surveyor - Data Center ConstructionTurner & Townsend · Van Wert, OH
More at Cumming Group
All Cumming Group jobsCommon questions
What is the salary for the Senior Cost Manager (Data Center Construction) role at Cumming Group?
The Senior Cost Manager (Data Center Construction) posting at Cumming Group states compensation of $130,500 – $174,033 per year. Final pay may depend on location, experience, and interview evaluation on Cumming Group's official career site.
Where is the Senior Cost Manager (Data Center Construction) job at Cumming Group located?
This Senior Cost Manager (Data Center Construction) position at Cumming Group is located in New York, NY. Always check Cumming Group's application page for specific state eligibility or relocation policies.
How do I apply for the Senior Cost Manager (Data Center Construction) position at Cumming Group?
This listing links directly to Cumming Group's Workday application page. You can apply directly on Cumming Group's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.