Turner & Townsend
Consulting & Professional ServicesDirect SmartRecruiters career site

Senior Electrical Cost Estimator - Data Center Construction

Pay
$100,000 – $170,000 per year
Location
San Francisco, CA (Remote)
Job type
Full-time
Level
Senior
Education
Bachelor's degree
Listed
Today

Skills & highlights for this role

  • electrical cost estimating
  • medium-voltage systems
  • UPS systems
  • switchgear
  • Bluebeam

Also useful

  • AutoCAD
  • Navisworks
  • CCP
  • CEP

About the role

Turner & Townsend is seeking an experienced Senior Electrical Estimator to support cost management and estimating activities on large-scale data center and mission-critical construction projects. This role will play a key part in the planning and delivery of hyperscale and colocation developments by providing accurate cost planning, estimating, and commercial guidance throughout all phases of the project lifecycle.

Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment. Preference will be given to candidates located in or near San Francisco, CA.

Responsibilities

  • Develop conceptual, schematic, design development, and detailed electrical cost estimates and cost plans.
  • Prepare and present estimate deliverables, cost reports, and commercial recommendations to clients and project teams.
  • Support feasibility studies, budgeting, cost benchmarking, and business case development for data center projects.
  • Review drawings, specifications, and vendor information to develop accurate electrical estimates and quantity takeoffs.
  • Lead procurement activities, including bid package development, contractor prequalification, bid evaluations, leveling, and recommendations.
  • Review and validate subcontractor and vendor pricing for electrical systems and equipment.
  • Manage post-contract cost control activities, including change management, forecasting, and cost variance analysis.
  • Produce monthly cost reports and present findings to stakeholders and leadership teams.
  • Support value engineering initiatives and identify cost-saving opportunities while maintaining project objectives.
  • Collaborate closely with clients, designers, contractors, and supply chain partners throughout all project phases.
  • Mentor junior estimators and cost management professionals.
  • Support client relationship management and business development initiatives.
  • SOX control responsibilities may form part of this role and must be adhered to where applicable.

Qualifications & Requirements

  • Strong technical experience across all areas of cost management, including pre-contract, post-contract, and final account.
  • Extensive experience estimating electrical scopes for data centers, mission-critical facilities, advanced technology, industrial, or large-scale commercial projects.
  • Strong understanding of medium-voltage and low-voltage electrical systems, substations, switchgear, generators, UPS systems, transformers, busway, and power distribution infrastructure.
  • Experience preparing conceptual through detailed estimates for large and complex construction projects.
  • Strong knowledge of contractor means and methods, procurement strategies, and construction delivery models.
  • Demonstrated ability to review drawings, specifications, and design documentation to identify scope and pricing risks.
  • Excellent presentation, verbal, written, and client-facing communication skills.
  • Proficiency with Microsoft Office, Bluebeam, AutoCAD, Navisworks, and related estimating software.
  • Strong organizational skills and ability to manage multiple priorities in a fast-paced environment.
  • Experience supporting value management, value engineering, and lifecycle costing initiatives.
  • Experience working directly with clients and contributing to business development efforts.
  • Bachelor's degree in Construction Management, Engineering, Quantity Surveying, or a related field preferred.
  • Significant experience in electrical estimating, cost management, quantity surveying, or preconstruction services.
  • Data center, mission-critical, semiconductor, advanced manufacturing, or industrial project experience strongly preferred.
  • Experience estimating large-scale electrical construction packages and critical power infrastructure required.
  • Professional certifications such as CCP, CEP, CPE, PQS, MRICS, or similar are a plus.

Additional Information

*On-site presence and requirements may change depending on our client's needs.

The salary range for this role is $100,000-$170,000 USD. This range reflects the company's good faith estimate of the base salary for this position at the time of the posting. Final compensation will be determined based on factors including experience, skills, qualifications, and internal equity. In addition to base salary, employees may be eligible for bonuses and a comprehensive benefits package.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

All your information will be kept confidential according to EEO guidelines.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects:

  • Twitter
  • Instagram
  • LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

About the Company

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programs as we turn challenge into opportunity and complexity into success.

Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.

We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world.

Read the original posting

From Turner & Townsend's careers page, first listed on Rolev.ai on November 17, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Senior Electrical Cost Estimator - Data Center Construction role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Senior Electrical Cost Estimator - Data Center Construction role at Turner & Townsend?

The Senior Electrical Cost Estimator - Data Center Construction posting at Turner & Townsend states compensation of $100,000 – $170,000 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on Turner & Townsend's official career site.

Where is the Senior Electrical Cost Estimator - Data Center Construction job at Turner & Townsend located?

Yes, this Senior Electrical Cost Estimator - Data Center Construction opening at Turner & Townsend is listed as San Francisco, CA (Remote). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.

What qualifications are required for Senior Electrical Cost Estimator - Data Center Construction at Turner & Townsend?

For the Senior Electrical Cost Estimator - Data Center Construction role, Turner & Townsend highlights a bachelor's degree; experience with electrical cost estimating, medium-voltage systems, UPS systems, switchgear, Bluebeam. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the Senior Electrical Cost Estimator - Data Center Construction position at Turner & Townsend?

This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.