Senior Electrical Estimator - Data Center Construction
- Pay
- $130,000 – $170,000 per year
- Location
- Remote (US)
- Listed
- 3 days ago
About the role
Turner & Townsend is seeking an experienced Senior Electrical Estimator to support the delivery of large-scale, mission-critical data center programs. This role is central to the commercial planning and execution of hyperscale facilities, where electrical infrastructure represents a significant portion of total project cost, schedule risk, and operational performance.
The Senior Electrical Estimator will lead the development of detailed electrical estimates for power distribution, backup generation, and critical systems, providing commercial and technical leadership throughout the project lifecycle. This role works closely with engineering, construction, and procurement teams and requires strong technical expertise, sound estimating judgment, and experience in fast-paced, standardized delivery environments.
Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment.
Responsibilities
- Lead the preparation of detailed electrical cost estimates for hyperscale data center projects, including medium- and low-voltage distribution, substations, UPS systems, generators, switchgear, busway, grounding, and lighting systems.
- Perform and oversee comprehensive electrical quantity takeoffs from drawings, specifications, and BIM models, including conduit, cabling, transformers, generators, and associated infrastructure.
- Develop, validate, and challenge labor, material, and equipment pricing models aligned with project budgets, delivery strategies, and evolving market conditions.
- Establish and maintain historical cost data, benchmarks, and estimating standards to support large-scale programs and future project forecasting.
- Review, analyze, and normalize electrical contractor and subcontractor bids, identifying scope gaps, cost risks, and commercial exposure.
- Lead and support value engineering and design optioneering efforts, evaluating alternative electrical systems, layouts, and installation methods while maintaining redundancy and reliability requirements.
- Partner closely with engineering, procurement, and construction leaders to inform electrical system decisions based on cost, constructability, schedule, and risk.
- Identify and proactively manage risks related to long-lead electrical equipment, supply chain constraints, labor availability, and market escalation.
- Account for regional cost variability across U.S. markets, including labor rates, logistics constraints, permitting considerations, and utility interface requirements.
- Support estimating for large-scale power infrastructure, including utility tie-ins, substations, and campus-wide electrical distribution.
- Contribute to standardized data center designs and repeatable delivery models, improving cost certainty, scalability, and speed to market.
- Ensure electrical estimates align with applicable codes, safety standards, sustainability objectives, and energy efficiency requirements.
- Prepare clear, defensible estimating deliverables and present findings to internal teams and external stakeholders.
- Participate in cost reviews, procurement discussions, funding approvals, and commercial strategy sessions.
- Support change management by assessing electrical scope changes and cost impacts throughout the design and construction lifecycle.
- Provide estimating handover materials to construction teams to support alignment between estimate and execution.
- Offer mentorship and technical guidance to junior estimators and contribute to estimating best practices.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications & Requirements
- Bachelor's degree in Electrical Engineering, Construction Management, or a related discipline, or equivalent professional experience.
- 7+ years of experience in electrical estimating, with strong preference for data center, mission-critical, or large-scale infrastructure projects.
- Advanced technical knowledge of power distribution systems, backup generation, UPS systems, electrical codes, and labor productivity.
- Demonstrated experience estimating high-density and hyperscale electrical systems is highly desirable.
- Proficiency in estimating and takeoff tools such as Accubid, ConEst, McCormick, Bluebeam, or similar platforms, with strong familiarity interpreting BIM-based information.
- Strong analytical and communication skills, with the ability to clearly articulate cost drivers, assumptions, and risks.
- Proven ability to operate independently while providing leadership within a collaborative, multidisciplinary project environment.
Additional Information
*On-site presence and requirements may change depending on our client's needs.*
The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate's experience and qualifications.
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend does not accept any speculative or unsolicited CV's that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV's will be treated as a direct application.
All your information will be kept confidential according to EEO guidelines.
#LI-MB1
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
About the Company
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programmes as we turn challenge into opportunity and complexity into success.
Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world.
Equal opportunity and legal notices
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
From Turner & Townsend's careers page, first listed on Rolev.ai on November 6, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Senior Electrical Estimator - Data Center Construction role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
- Senior Electrical Estimator (Austin, TX)Enterprise Electrical · Pflugerville, TX
- Senior Electrical Engineer / DesignerAllen + Shariff Corporation · Pittsburgh, PA
- Senior Electrical EngineerSymmetrio · Melbourne, FL
- Senior Electrical EngineerLaBella Associates · Rochester, NY
- Senior Electrical EngineerTechFlow, Inc. · United States, NC
- Senior Electrical Engineer - PE - Commercial High-Rise MEPAlphaX · Fort Lauderdale, FL
Common questions
What is the salary for the Senior Electrical Estimator - Data Center Construction role at Turner & Townsend?
The Senior Electrical Estimator - Data Center Construction posting at Turner & Townsend states compensation of $130,000 – $170,000 per year. Final pay may depend on location, experience, and interview evaluation on Turner & Townsend's official career site.
Where is the Senior Electrical Estimator - Data Center Construction job at Turner & Townsend located?
Yes, this Senior Electrical Estimator - Data Center Construction opening at Turner & Townsend is listed as Remote (US). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.
How do I apply for the Senior Electrical Estimator - Data Center Construction position at Turner & Townsend?
This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.