Senior Project Engineer - Data Center Construction
- Pay
- $36 – $62 per hour
- Location
- Dallas, TX
- Listed
- Today
How well does your resume fit this job?
Upload your resume to see your score for this Mckinstry role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
About the role
Position at Mckinstry Co., LLC
Build the future, spark innovation and align your career with purpose.
McKinstry is innovating the waste and climate harm out of the built environment and creating lasting impact. Together, we’re building a thriving planet.
Buildings are a leading contributor to the climate crisis, generating nearly 40% of total global energy-related carbon emissions. We’re making a lasting impact on our industry and within our communities by addressing the climate, affordability and equity crises through:
renewables and energy services engineering and design construction and facility services
To get where we’re going, we need big thinkers, problem solvers and collaborative mindsets. Does that sound like you?
The Opportunity with Mckinstry
McKinstry is looking for a Senior Project Engineer - Data Center Construction to join our Data Center Innovations division in Dallas, TX. This role is responsible for overseeing the delivery of complex projects, with responsibility for fiscal outcomes, technical quality, and stakeholder coordination from initiation through closeout. Additional responsibilities may include:
Project Coordination
- Serve as the on-site point of contact for clients, subcontractors, vendors, and field personnel as needed.
- Support Request for Proposal (RFP) processes.
- Coordinate equipment procurement with the purchasing department and outside vendors to order and expedite material.
- Assist in the development of scope of work for subcontractors.
- Oversee the scheduling and coordination of trades.
Assist with project controls, including reviewing and substantiating subcontractor billings, drafting subcontract and purchasing agreements, assisting with client billings, and assuming responsibility for project fiscal performance with oversight of the Project Manager.
Assist in preparation of monthly project accounting review.
Manage and ensure accuracy of cost issue logs.
Documentation
- Maintain drawings, daily correspondence with trades, schedules, RFI logs, submittal logs, and Superintendent daily reports.
- Create and respond to Requests for Information (RFI).
- Create site-specific work plans.
- Process, review, log, and distribute submittals.
- Create and publish Operations and Maintenance Manuals for clients.
- Obtain detailed knowledge of contract, drawings, and specifications for assigned projects.
- Maintain cost issue logs.
Safety
Assess site safety and implement actions to prevent injury to property and personnel.
Uphold and communicate McKinstry safety standards.
Coordinate with the Safety Team to create and communicate site safety plans.
What You Need To Succeed at Mckinstry
- Proficiency in all Construction Project Engineer responsibilities.
- BA/BS in Construction Management, Mechanical Engineering, Electrical Engineering, Architecture, Facilities Management, or comparable degree.
- 2 years of Project Engineer role equivalent required.
- Knowledge of construction management, commercial building process, and financial acumen required.
- Experience on large data center projects in preferred.
- Professional Engineer (PE) and LEED professional designations preferred.
PeopleFirst Benefits
When it comes to the basics, we have you covered
- Competitive pay
- 401(k) with employer match and profit-sharing plan
- Paid time off and holidays
Comprehensive medical, prescription, dental, and vision with low or zero deductible options and low out of pocket maximums
Benefits
People come first at Mckinstry, and we go beyond the basic benefits with:
Benefits
Family formation benefits, including adoption and IVF assistance:
Up to 16 weeks paid parental leave
Commuter benefits
- Pet insurance
- “Building Good” paid community service time
- Learning and advancement opportunities via McKinstry University
- McKinstry Moves onsite gyms or reimbursement for remote workers
- See benefit plan documents for complete details.
- If you’re driven by our vision to build a thriving planet together, McKinstry is the place to build your career.
- The pay range for this position is $36.48 - $61.97 per hour; however, base pay offered may vary depending on job-related knowledge, skills, and experience.
- This position is considered non-exempt and will be paid hourly.
- A bonus may be provided as part of the compensation package, in addition to a full range of medical, financial, and/or other benefits, dependent on the position offered.
- Base pay information is based on market location.
- Applicants for this role will only be considered if they possess current US Work Authorization, and do not require employer-sponsored VISA support to begin or remain in this role.
- #LI-TG1
Equal opportunity and legal notices
The McKinstry group of companies are equal opportunity employers. We are committed to providing equal employment opportunities to all employees and qualified applicants without regard to sex, gender identity, sexual orientation, age, race, color, creed, marital status, national origin, disability, veteran status, genetic information or any other basis protected by law.
This policy applies to all terms and conditions of employment including, but not limited to employment, advancement, assignment, and training. This commitment to Equal Employment Opportunity is made equally as a social responsibility and as an economic and business necessity.
McKinstry is a drug-free workplace. Employment is contingent upon successfully passing a pre-employment drug and alcohol test, complying with the requirements of the Immigration Reform and Control Act and a Confidentiality Agreement, in addition to successful outcomes of background and reference checks.
From Mckinstry's careers page, first listed on Rolev.ai on November 25, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Senior Project Engineer - Data Center Construction role at Mckinstry, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
Common questions
What is the salary for the Senior Project Engineer - Data Center Construction role at Mckinstry?
The Senior Project Engineer - Data Center Construction posting at Mckinstry states compensation of $36 – $62 per hour. Final pay may depend on location, experience, and interview evaluation on Mckinstry's official career site.
Where is the Senior Project Engineer - Data Center Construction job at Mckinstry located?
This Senior Project Engineer - Data Center Construction position at Mckinstry is located in Dallas, TX. Always check Mckinstry's application page for specific state eligibility or relocation policies.
How do I apply for the Senior Project Engineer - Data Center Construction position at Mckinstry?
This listing links directly to Mckinstry's Jobvite application page. You can apply directly on Mckinstry's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Jobvite application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.