Cumming Group
Direct Workday career site

Senior Project Manager - Data Center Construction

Pay
$115,700 – $161,967 per year
Location
USA Client Site, AL
Listed
Today

Position Summary

The Senior Project Manager will support the data hall portion of a new-build data center projects at our Monroe and Mobile, AL locations. This role will lead customer-specific construction and fit-out activities, coordinating design, procurement, construction, commissioning, and turnover to ensure scope, schedule, budget, and operational readiness requirements are met. Come join our team!

Essential Duties & Responsibilities

  • Lead customer-specific construction and fit-out scope within large-scale data center projects.
  • Coordinate customer requirements with design, engineering, construction, procurement, commissioning, and operations teams.
  • Manage scope, budget, schedule, procurement, risk, and change management through turnover.
  • Review customer requirements and impacts to architectural, structural, mechanical, electrical, controls, security, and life-safety systems.
  • Lead design coordination and technical reviews with customers, consultants, contractors, and internal teams.
  • Develop scopes of work, bid packages, cost estimates, and procurement plans.
  • Manage change orders, commercial impacts, and cost recovery related to customer-driven changes.
  • Track long-lead equipment and materials and drive procurement to protect project milestones.
  • Coordinate field execution with General Contractors, trade partners, vendors, commissioning teams, and customer representatives.
  • Monitor progress, critical-path activities, and project risks; drive mitigation and recovery plans as needed.
  • Serve as a primary customer interface throughout construction, commissioning, and turnover.
  • Lead punch list, closeout, documentation, and operational readiness activities.
  • Provide regular reporting on cost, schedule, procurement, risk, and key customer commitments.

Knowledge & Skills Required

  • Experience managing data center, mission-critical, industrial, or other complex construction projects.
  • Strong understanding of data center design, construction, fit-out, commissioning, and turnover.
  • Experience managing projects from design through construction and operational handoff.
  • Working knowledge of mechanical, electrical, controls, security, and other critical systems.
  • Experience with budgets, cost estimates, contracts, change orders, procurement, and commercial negotiations.
  • Strong knowledge of construction sequencing, scheduling, long-lead procurement, and risk management.
  • Ability to manage contractors, consultants, vendors, and multidisciplinary project teams.
  • Strong customer-facing communication, leadership, negotiation, and problem-solving skills.
  • Ability to manage multiple priorities in a fast-paced construction environment.

Knowledge & Skills Required

  • 6+ years of construction project management experience, including mission-critical or data center projects.
  • Proven experience managing projects through design, procurement, construction, commissioning, and closeout.
  • Knowledge of data center electrical, mechanical, and critical infrastructure systems.
  • Experience managing contractors, consultants, budgets, schedules, and stakeholder relationships.
  • Data center experience highly preferred.

Preferred Education and Experience

  • Education: BS in Construction, Engineering, or related field
  • Experience: 8+ years experience in project management, preferably on data center builds.
  • #LI-VM1

Pay and benefits

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.

Benefits

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program

#LI-SJ2

About Cumming Group

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!

Read the original posting

From Cumming Group's careers page, first listed on Rolev.ai on November 17, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Senior Project Manager - Data Center Construction role at Cumming Group, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Senior Project Manager - Data Center Construction role at Cumming Group?

The Senior Project Manager - Data Center Construction posting at Cumming Group states compensation of $115,700 – $161,967 per year. Final pay may depend on location, experience, and interview evaluation on Cumming Group's official career site.

Where is the Senior Project Manager - Data Center Construction job at Cumming Group located?

This Senior Project Manager - Data Center Construction position at Cumming Group is located in USA Client Site, AL. Always check Cumming Group's application page for specific state eligibility or relocation policies.

How do I apply for the Senior Project Manager - Data Center Construction position at Cumming Group?

This listing links directly to Cumming Group's Workday application page. You can apply directly on Cumming Group's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.