Turner & Townsend
Direct SmartRecruiters career site

Site Engineering & Design Manager - Data Center Construction (Per Diem)

Pay
$140,000 – $180,000 per year
Location
Dallas, TX (Remote)
Listed
3 days ago

About the role

We are seeking an experienced Site Engineering & Design Manager to join a large-scale data center development program and serve as an embedded member of the program team. This role will be responsible for managing the Request for Information (RFI) process, coordinating multidisciplinary design activities, tracking design issues and action items, and supporting overall program governance.

The successful candidate will act as a key liaison between design, construction, and program management teams, ensuring that RFIs, design deliverables, and documentation are managed efficiently while maintaining established design authority and governance protocols. This position requires strong organizational, technical writing, and stakeholder management skills, along with experience supporting complex capital projects in mission-critical environments.

Responsibilities

RFI Management

  • Manage and maintain the project RFI register, ensuring all RFIs are logged, categorized, prioritized, and tracked through resolution.
  • Review, triage, and classify RFIs according to established project protocols and escalation criteria.
  • Draft proposed responses for routine RFIs using existing contract documents, drawings, specifications, and approved project precedents.
  • Coordinate review and approval of drafted responses with designated client design representatives before formal issuance.
  • Escalate RFIs involving design changes, code interpretations, schedule impacts, cost implications, or technical ambiguities to the appropriate design authority.
  • Monitor RFI status, due dates, and turnaround times to support project schedule objectives.
  • Maintain accurate audit trails documenting authorship, review, approval, and issuance of all RFI responses.

Design Coordination & Program Support

  • Coordinate design deliverables, review cycles, and comment resolution activities across architectural, structural, mechanical, electrical, controls, and specialty disciplines.
  • Track design-related risks, open issues, and action items, ensuring timely follow-up and resolution.
  • Facilitate design coordination meetings, including agenda preparation, meeting documentation, and action item management.
  • Identify and communicate design process bottlenecks that may affect project execution or construction activities.
  • Support document management efforts, including maintenance of:
  • Design basis documentation
  • RFI registers
  • Submittal logs
  • Design issue logs
  • Lessons learned databases
  • Promote cross-functional collaboration between project stakeholders, consultants, contractors, and client teams.

Reporting & Governance

  • Prepare and deliver regular program reports on RFI metrics, design status, issue resolution, and project risks.
  • Analyze RFI trends and recurring issues to identify opportunities for process improvement and enhanced design clarity.
  • Support development and continuous refinement of RFI management protocols and governance procedures.
  • Ensure compliance with project documentation standards, approval workflows, and established authority boundaries.

SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications & Requirements

  • Bachelor's degree in Engineering, Architecture, Construction Management, or a related technical discipline, or equivalent combination of education and experience.
  • Must be able to travel to remote job site locations during the week and per diem will be provided.
  • 5+ years of experience in project engineering, design management, construction administration, or technical project coordination on large capital projects.
  • Experience supporting multidisciplinary design teams through design development, construction documentation, and construction phases.
  • Strong knowledge of RFI, submittal, and design change management processes.
  • Experience working within design-build, EPC, or traditional delivery models.
  • Proficiency with project information management platforms such as:
  • Procore
  • Aconex
  • Autodesk Construction Cloud / BIM 360
  • Similar project collaboration systems
  • Strong technical writing and documentation skills.

Preferred Qualifications

  • Experience supporting data center, mission-critical, industrial, or large infrastructure projects.
  • Familiarity with data center design fundamentals, including:
  • Electrical distribution systems
  • Mechanical cooling systems
  • Building controls systems
  • Reliability and redundancy concepts
  • Experience operating within sophisticated program management and governance environments.
  • Exposure to commissioning, design validation, or construction quality processes.

Additional Information

The salary range for this role is $140,000 - $180,000. This range reflects the company's good faith estimate of the base salary for this position at the time of the posting. Final compensation will be determined based on factors including experience, skills, qualifications, and internal equity. In addition to base salary, employees may be eligible for bonuses and a comprehensive benefits package.

*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects:

  • Twitter
  • Instagram
  • LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

About the Company

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programmes as we turn challenge into opportunity and complexity into success.

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.

We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world.

Read the original posting

From Turner & Townsend's careers page, first listed on Rolev.ai on November 6, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Site Engineering & Design Manager - Data Center Construction (Per Diem) role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Site Engineering & Design Manager - Data Center Construction (Per Diem) role at Turner & Townsend?

The Site Engineering & Design Manager - Data Center Construction (Per Diem) posting at Turner & Townsend states compensation of $140,000 – $180,000 per year. Final pay may depend on location, experience, and interview evaluation on Turner & Townsend's official career site.

Where is the Site Engineering & Design Manager - Data Center Construction (Per Diem) job at Turner & Townsend located?

Yes, this Site Engineering & Design Manager - Data Center Construction (Per Diem) opening at Turner & Townsend is listed as Dallas, TX (Remote). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.

How do I apply for the Site Engineering & Design Manager - Data Center Construction (Per Diem) position at Turner & Townsend?

This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.