Wastewater Construction Manager (Data Center Construction)
- Pay
- $153,100 – $214,366 per year
- Location
- Vernon, TX · On-site
- Job type
- Full-time
- Level
- Lead / Staff
- Posted
- 5 days ago
How well does your resume fit this job?
Upload your resume to see your score for this Cumming Group role, what matches, what's missing, and your best other matches.
Scored on our server and not saved there. The file stays in this browser so you don't have to upload it again after you sign up.
About the role
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
We are hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas.
This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities.
This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.
Role Overview
The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems.
This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements.
You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.
Key Responsibilities – Construction Execution
- Act as the owner’s representative field lead for wastewater and water systems
- Oversee daily construction activities and installation of:
- Wastewater treatment systems
- Industrial water handling and discharge systems
- Process piping and utility infrastructure
- Monitor contractor performance, manpower, and sequencing to maintain schedule
- Perform regular site walkdowns to verify installation quality and identify issues early
- Enforce compliance with drawings, specifications, and construction standards
- Coordinate across trades to resolve clashes, access constraints, and install conflicts
- Drive execution of RFIs, submittals, and field clarifications
- Support QA/QC including inspections, testing, and punchlist management
- Partner with commissioning teams for startup, flushing, testing, and turnover
- Track progress, maintain documentation, and report field issues
- Promote a safety-first, high accountability jobsite culture
- Mentor junior staff and reinforce field best practices
Requirements
- 5 to 10 years of construction management or field supervision experience in:
- Data centers
- Industrial water or wastewater systems
- Advanced manufacturing
- Oil and gas or heavy industrial environments
- Strong background in field execution, sequencing, and trade coordination
- Experience with process piping, utility systems, or industrial infrastructure
- Ability to operate in fast-paced, schedule-driven environments
- Working knowledge of water and wastewater codes and standards
- Proficiency with construction documentation and reporting tools
Preferred Experience
- Hyperscale data center or mission critical project experience
- Exposure to commissioning, startup, and turnover
- Experience in an owner’s representative environment
- OSHA 30 or equivalent certification
- Multi-site or large program experience
Education
- Bachelor’s degree in Construction Management, Engineering, or related field preferred
- Equivalent field experience will be considered
Pay and benefits
The salary range for this full-time role is $153,100.00-$214,366.70 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
Benefits
In addition to base salary, WWPS offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
- Company-Paid Parental Leave
- State Paid Family and Medical Leave (where applicable)
- Lifestyle Spending Account (LSA)
- Professional Development & Tuition Assistance
- #WWPS
- #LI-PT1
Equal opportunity and legal notices
World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices.
It is WWPS' policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law.
All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
From Cumming Group's careers page, posted on November 21, 2026, first listed on Rolev.ai on November 20, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Wastewater Construction Manager (Data Center Construction) role at Cumming Group, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
All Construction Manager jobsCommon questions
What is the salary for the Wastewater Construction Manager (Data Center Construction) role at Cumming Group?
The Wastewater Construction Manager (Data Center Construction) posting at Cumming Group states compensation of $153,100 – $214,366 per year. It is listed as a full-time position. Final pay may depend on location, experience, and interview evaluation on Cumming Group's official career site.
Where is the Wastewater Construction Manager (Data Center Construction) job at Cumming Group located?
This Wastewater Construction Manager (Data Center Construction) position at Cumming Group is located in Vernon, TX (On-site). Always check Cumming Group's application page for specific state eligibility or relocation policies.
How do I apply for the Wastewater Construction Manager (Data Center Construction) position at Cumming Group?
This listing links directly to Cumming Group's Workday application page. You can apply directly on Cumming Group's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workday application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.