World Wide Professional Solutions
Direct Lever career site

Wastewater Construction Manager (Data Center Construction) - Texas

Location
Vernon, TX · On-site
Job type
Full-time
Level
Senior
Experience
5+ years
Education
Bachelor's degree
Listed
19 days ago

Skills & highlights for this role

  • Construction management or field supervision experience
  • Field execution and sequencing
  • Trade coordination
  • Process piping and utility systems experience
  • Knowledge of water and wastewater codes and standards
  • Construction documentation and reporting tools

Also useful

  • Hyperscale data center or mission critical project experience
  • Commissioning, startup, and turnover exposure
  • Owner's representative environment experience
  • OSHA 30 or equivalent certification
  • Multi-site or large program experience

About the Role

WORLD WIDE PROFESSIONAL SOLUTIONS is hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas.

This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities.

This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.

Role Overview

The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems.

This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements.

You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.

Key Responsibilities - Construction Execution

Act as the owner’s representative field lead for wastewater and water systems

Oversee daily construction activities and installation of

  • Wastewater treatment systems
  • Industrial water handling and discharge systems
  • Process piping and utility infrastructure
  • Monitor contractor performance, manpower, and sequencing to maintain schedule
  • Perform regular site walkdowns to verify installation quality and identify issues early
  • Enforce compliance with drawings, specifications, and construction standards
  • Coordinate across trades to resolve clashes, access constraints, and install conflicts
  • Drive execution of RFIs, submittals, and field clarifications
  • Support QA/QC including inspections, testing, and punchlist management

Partner with commissioning teams for startup, flushing, testing, and turnover:

  • Track progress, maintain documentation, and report field issues
  • Promote a safety-first, high accountability jobsite culture
  • Mentor junior staff and reinforce field best practices

Requirements

5 to 10 years of construction management or field supervision experience in:

  • Data centers
  • Industrial water or wastewater systems
  • Advanced manufacturing
  • Oil and gas or heavy industrial environments

Strong background in field execution, sequencing, and trade coordination

Experience with process piping, utility systems, or industrial infrastructure:

  • Ability to operate in fast-paced, schedule-driven environments
  • Working knowledge of water and wastewater codes and standards
  • Proficiency with construction documentation and reporting tools

Preferred Experience

  • Hyperscale data center or mission critical project experience
  • Exposure to commissioning, startup, and turnover
  • Experience in an owner’s representative environment
  • OSHA 30 or equivalent certification
  • Multi-site or large program experience
  • Education

Bachelor’s degree in Construction Management, Engineering, or related field preferred:

  • Equivalent field experience will be considered
  • What Sets This Role Apart
  • Full-time role with WWPS. Not a contract
  • Long-term pipeline across multiple hyperscale data center builds
  • Field-focused position with direct impact on execution and delivery
  • Exposure to large-scale, technically complex infrastructure

Pay and benefits

Competitive compensation, full benefits, and career growth

About World Wide Professional Solutions

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

Read the original posting

From World Wide Professional Solutions's careers page, first listed on Rolev.ai on October 21, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Wastewater Construction Manager (Data Center Construction) - Texas role at World Wide Professional Solutions, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

Where is the Wastewater Construction Manager (Data Center Construction) - Texas job at World Wide Professional Solutions located?

This Wastewater Construction Manager (Data Center Construction) - Texas position at World Wide Professional Solutions is located in Vernon, TX (On-site). Always check World Wide Professional Solutions's application page for specific state eligibility or relocation policies.

What qualifications are required for Wastewater Construction Manager (Data Center Construction) - Texas at World Wide Professional Solutions?

For the Wastewater Construction Manager (Data Center Construction) - Texas role, World Wide Professional Solutions highlights 5+ years of relevant experience; a bachelor's degree; experience with Construction management or field supervision experience, Field execution and sequencing, Trade coordination, Process piping and utility systems experience, Knowledge of water and wastewater codes and standards, Construction documentation and reporting tools. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.

How do I apply for the Wastewater Construction Manager (Data Center Construction) - Texas position at World Wide Professional Solutions?

This listing links directly to World Wide Professional Solutions's Lever application page. You can apply directly on World Wide Professional Solutions's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Lever application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.