Wastewater Treatment Project Manager (Data Center Construction) - Texas
- Location
- Vernon, TX · On-site
- Job type
- Full-time
- Level
- Senior
- Experience
- 5+ years
- Listed
- 19 days ago
Skills & highlights for this role
- Construction experience (5-8 years) in data centers, industrial water/wastewater, advanced manufacturing, oil and gas, or heavy industrial
- Experience with process utility systems, water infrastructure, or industrial piping
- Construction execution, sequencing, and coordination
- Working knowledge of applicable water and wastewater codes and standards
- QA/QC execution
- Commissioning, turnover, and startup support
Also useful
- Mission critical or hyperscale data center construction
- Owner's representative or construction management experience
- Lean construction and collaborative delivery
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization focused on delivering high-impact construction execution through lean practices, collaborative delivery, and performance-driven outcomes.
We are hiring a Wastewater Treatment Project Manager to support multiple hyperscale data center projects across North Texas. This role sits within our owner’s representative construction management team, overseeing critical process utility infrastructure tied to water and wastewater systems.
This is a full-time, long-term position with WWPS, not a contract or staff augmentation role. You will be embedded in major mission critical builds with continuity across projects, full benefits, and long-term career stability.
We are actively hiring for immediate project needs across multiple Texas sites and are structured to support both traveling and relocating candidates. Per-dem and travel packages are available, and we also offer relocation assistance for candidates seeking long-term placement.
This is an opportunity to step into a stable, long-term role with consistent project continuity, rather than short-term contract work. If you are looking for sustained engagement on large-scale, mission critical builds with a clear path forward, this role is built for that.
Role Overview
The Wastewater Treatment Project Manager is responsible for planning, coordinating, and overseeing the installation, commissioning, and turnover of water and wastewater infrastructure systems supporting hyperscale data center operations.
This role ensures systems are delivered on schedule, fully compliant, and aligned with mission critical performance standards, including reliability, maintainability, and environmental compliance.
You will operate in a fast-paced, zero downtime tolerance environment where execution quality and schedule adherence are critical to overall project success.
Key Responsibilities - Process Utility Systems
- Serve as the owner’s representative discipline lead for wastewater and water infrastructure systems across multiple active data center sites
- Oversee installation and execution of: Wastewater treatment systems, Industrial water handling and discharge systems, Cooling water support infrastructure as applicable
- Validate contractor scope, installation methods, and system compliance with approved drawings and specifications
- Lead coordination between contractors, design teams, and client stakeholders to resolve field issues quickly and effectively
- Drive design reviews, RFIs, submittals, and field clarifications related to process utility systems
- Perform regular site walkdowns to verify installation quality, identify deviations, and enforce construction standards
- Support QA/QC execution including inspection plans, testing procedures, and system validation
- Participate in commissioning, turnover, and startup activities to ensure systems meet operational readiness requirements
- Maintain accurate documentation including issue tracking, test records, and progress reporting
- Contribute to a commissioning-driven culture with strong focus on system performance and reliability
- Mentor junior staff and reinforce best practices across project teams
Requirements
- 5 to 8 years of construction experience in one or more of the following: Data centers, Industrial water or wastewater systems, Advanced manufacturing, Oil and gas or heavy industrial environments
- Experience supporting process utility systems, water infrastructure, or industrial piping systems
- Strong understanding of construction execution, sequencing, and coordination in complex environments
- Ability to operate in schedule-critical, fast-paced project environments
- Working knowledge of applicable codes and standards related to water and wastewater systems
- Proficiency with Microsoft Office and standard construction documentation platforms
Preferred Experience
- Experience on hyperscale or mission critical projects
- Exposure to commissioning and startup of utility systems
Familiarity with owner’s representative or client-side project delivery models:
- OSHA 30 or equivalent safety certification
- Experience working across multiple sites or large-scale programs
- Education
Bachelor’s degree in Construction Management, Engineering, or related field preferred:
- Equivalent field experience will be considered
- What Sets This Role Apart
- Full-time employment with WWPS. Not a contract role
- Long-term project pipeline across multiple hyperscale data center builds
- Opportunity to work within an owner’s representative structure, influencing outcomes rather than just executing scope
- Exposure to large-scale, technically complex, mission critical infrastructure
About World Wide Professional Solutions
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
Equal opportunity and legal notices
World Wide Professional Solutions provides equal employment opportunities to all employees and applicants and prohibits discrimination and harassment of any type in accordance with applicable laws.
From World Wide Professional Solutions's careers page, first listed on Rolev.ai on October 21, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Wastewater Treatment Project Manager (Data Center Construction) - Texas role at World Wide Professional Solutions, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Common questions
Where is the Wastewater Treatment Project Manager (Data Center Construction) - Texas job at World Wide Professional Solutions located?
This Wastewater Treatment Project Manager (Data Center Construction) - Texas position at World Wide Professional Solutions is located in Vernon, TX (On-site). Always check World Wide Professional Solutions's application page for specific state eligibility or relocation policies.
What qualifications are required for Wastewater Treatment Project Manager (Data Center Construction) - Texas at World Wide Professional Solutions?
For the Wastewater Treatment Project Manager (Data Center Construction) - Texas role, World Wide Professional Solutions highlights 5+ years of relevant experience; experience with Construction experience (5-8 years) in data centers, industrial water/wastewater, advanced manufacturing, oil and gas, or heavy industrial, Experience with process utility systems, water infrastructure, or industrial piping, Construction execution, sequencing, and coordination, Working knowledge of applicable water and wastewater codes and standards, QA/QC execution, Commissioning, turnover, and startup support. Rolev.ai can score your existing resume against these requirements and show any skill gaps before you apply.
How do I apply for the Wastewater Treatment Project Manager (Data Center Construction) - Texas position at World Wide Professional Solutions?
This listing links directly to World Wide Professional Solutions's Lever application page. You can apply directly on World Wide Professional Solutions's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Lever application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.