Turner & Townsend
Direct SmartRecruiters career site

Design Project Lead - Data Center Construction

Pay
$160,000 – $190,000 per year
Location
San Francisco, CA (Remote)
Listed
3 days ago

About the role

Turner & Townsend is seeking an experienced Design Project Lead to join our team. As an integral part of the Design Development and Delivery Team, this role will operate as the Design Project Lead overseeing the design and construction administration as an Owner's Representative, and lead the Civil, Structural, Landscape, Architecture (CSLA) disciplines as a subject matter expert.

The Design Project Lead will collaborate with multiple stakeholders including cross-discipline partners across the Design Engineering organization, internal partners such as Planning and Development, Construction Management, Quality, Safety, and Operations as well as external partners including engineers of record (EoR), general contractors, and regulatory agencies to deliver data center capacity safely, on time, within budget, and of high quality. This position is full-time providing directional guidance aligned with the pace of fast-tracked design and construction.

About the role

  • Provides support and reports to the assigned Project Manager(s) or Project Director. Position has frequent interaction with the Owner/Client, consultants, design professionals and contractors.
  • Directly assist the Project Manager(s) in managing, coordinating and administering the project through all phases of design and construction.
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client's needs are addressed.
  • Aids in the preparation of documents (reports, schedules, invoices, RFI's, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout and client presentations) for programming, design and construction and will assist in maintaining information in project management software.
  • Coordinate to schedule meetings with the project team as directed by the Project Manager(s).
  • Communicate conceptual designs and create/maintain project documentation before, during, and after construction.
  • Maintenance of Basis of Design, prototype design, and template specifications for architectural elements.
  • Review and inform design RFPs.
  • Manage our external design consultants through the design and construction process.
  • Effectively communicate design standards to internal and external project partners.
  • Manage multiple fast paced projects simultaneously.
  • Think outside of the box to find innovative solutions prior to and during the construction process to reduce costs without negative impacts on quality or reliability.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications & Requirements

  • College Degree in Business Administration, Construction Management, Engineering, Architecture.
  • 8+ years' experience in mission critical building design, construction and or operations.
  • Experience and working in Project Management on large-scale construction programs.
  • Experienced in Design/Architecture/Civil works.
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite.
  • Excellent presentation skills and the ability to be highly effective in a client-facing role.
  • Team player; ability to work collaboratively.

Additional Information

The salary range for this full-time role is $160K-$190K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate's experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

All your information will be kept confidential according to EEO guidelines.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects:

  • Twitter
  • Instagram
  • LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

About the Company

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programs as we turn challenge into opportunity and complexity into success.

Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.

We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world.

Read the original posting

From Turner & Townsend's careers page, first listed on Rolev.ai on November 6, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Design Project Lead - Data Center Construction role at Turner & Townsend, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Design Project Lead - Data Center Construction role at Turner & Townsend?

The Design Project Lead - Data Center Construction posting at Turner & Townsend states compensation of $160,000 – $190,000 per year. Final pay may depend on location, experience, and interview evaluation on Turner & Townsend's official career site.

Where is the Design Project Lead - Data Center Construction job at Turner & Townsend located?

Yes, this Design Project Lead - Data Center Construction opening at Turner & Townsend is listed as San Francisco, CA (Remote). Always check Turner & Townsend's application page for specific state eligibility or relocation policies.

How do I apply for the Design Project Lead - Data Center Construction position at Turner & Townsend?

This listing links directly to Turner & Townsend's SmartRecruiters application page. You can apply directly on Turner & Townsend's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the SmartRecruiters application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.