Construction Scheduler

Pay
$143,000 – $185,000 per year
Location
Honolulu, United States
Listed
Today

About the role

BB&E is an employee-owned, full-service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering, and Program/Project Management Services to the Federal and private sectors.

Position Summary

BB&E is seeking a dynamic and detail-oriented Scheduler to join our team, supporting the U.S. Army Corps of Engineers (USACE) Honolulu District (POH) Programs & Project Management Division (PPMD) by developing and maintaining resource-loaded Critical Path Method (CPM) schedules in Primavera P6 for an upcoming surge of FY27 projects. Work will be performed on-site at USACE Honolulu District facilities in Honolulu, HI, using Government-furnished computers. This position is contingent upon contract award.

Job Duties & Responsibilities

  • Input resource loaded Critical Path Method (CPM) schedules into Primavera P6
  • Enter, monitor, and update resource loaded schedules
  • Conduct resource analysis and critical path analysis, identifying any resulting impacts or opportunities for Government consideration
  • Develop all schedules using a modernized Program and Project Management Information Suite (PROMIS) (Primavera Project Manager/P6 Web), Corps of Engineers Financial Management System (CEFMS), and RMS
  • Run reports in Primavera and develop reports using MS Power BI and other MS applications

Key Qualifications

  • U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required
  • Primavera P6: Proficiency in Primavera P6, with the ability to work independently in the software from day one, is required
  • Reporting: Experience running reports in Primavera and experience using MS Power BI and other MS applications to develop reports is required
  • Strong Communication Skills: Ability to effectively communicate both orally and in writing

Requirements & Qualifications

  • Experience: Fifteen (15) or more years of total relevant experience is required. In addition, a minimum of three (3) full years of experience using Primavera Project Manager/P6 to manage and update resource-loaded CPM project schedules is required

Physical Requirements and Work Environment

  • Remain in a stationary position for extended periods
  • Use computers, telephones, and other office equipment
  • Move throughout offices, facilities, and project sites
  • Reach, grasp, handle equipment, and operate controls
  • Communicate effectively and review documents, equipment, and site conditions
  • Lift and carry materials or equipment weighing up to 50 pounds when required by the assignment
  • Stand or walk for extended periods and occasionally climb, kneel, or crouch
  • Navigate uneven or rough terrain when required
  • Work indoors and outdoors in varying weather conditions
  • Occasionally enter confined spaces or work at heights when required
  • Wear required personal protective equipment
  • Work in environments that may include noise, dust, fumes, chemicals, electrical hazards, construction activity, or other site specific conditions

Benefits & Perks

  • Competitive compensation packages. $143,000-$185,000 annually. This range represents good-faith compensation for the position at the time of posting. Individual compensation is determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements.
  • Participation in the Employee Stock Ownership Plan – BB&E is 100% employee-owned!
  • Discretionary bonus
  • *Medical, Dental, and Vision Insurance with health care concierge
  • *Employer provided Short-Term & Long-Term disability
  • *Employer provided Life insurance
  • *Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits
  • *Generous PTO plus 11 paid holidays
  • Traditional & Roth 401(k) options with fully vested employer match
  • Tuition reimbursement & professional development
  • Employee referral program
  • Financial wellness resources
  • Employee discounts
  • Employee Assistance Program (EAP)
  • Pet insurance discount

*Applies only to full-time employees

BB&E supports pay transparency and is committed to equitable and competitive compensation practices. Compensation for this role will be determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements. Where required by law, compensation ranges will be provided to candidates during the hiring process.

Read the original posting

From Bb&E Consulting Engineers And Professionals's careers page, first listed on Rolev.ai on November 13, 2026. Rolev.ai is not the employer.

How Rolev.ai helps with this application

Rolev.ai is a job search and application tool for US job seekers. For this Construction Scheduler role at Bb&E Consulting Engineers And Professionals, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.

  • See how you fit

    Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.

  • Tailor without inventing

    Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.

  • Draft the full kit

    Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.

  • 1-Click Extension Autofill

    The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.

Common questions

What is the salary for the Construction Scheduler role at Bb&E Consulting Engineers And Professionals?

The Construction Scheduler posting at Bb&E Consulting Engineers And Professionals states compensation of $143,000 – $185,000 per year. Final pay may depend on location, experience, and interview evaluation on Bb&E Consulting Engineers And Professionals's official career site.

Where is the Construction Scheduler job at Bb&E Consulting Engineers And Professionals located?

This Construction Scheduler position at Bb&E Consulting Engineers And Professionals is located in Honolulu, United States. Always check Bb&E Consulting Engineers And Professionals's application page for specific state eligibility or relocation policies.

How do I apply for the Construction Scheduler position at Bb&E Consulting Engineers And Professionals?

This listing links directly to Bb&E Consulting Engineers And Professionals's Workable application page. You can apply directly on Bb&E Consulting Engineers And Professionals's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workable application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.