Construction Scheduler
- Pay
- $140,000 – $200,000 per year
- Location
- San Francisco, CA
- Listed
- 2 days ago
The role
Raydar is recruiting for this role on behalf of our client. Bring deep field-tested construction management expertise to a software team building a time-based planning feature. Act as the internal authority on how building projects are sequenced and delivered, guiding product and engineering choices.
What you'll do
- Help shape and build a planning feature that connects 3D models to project timelines, modeled on how real builds are sequenced and delivered.
- Inform product and engineering choices with practical general contractor experience.
- Act as the team's go-to expert on how construction work is sequenced and carried out.
- Review plans and drawings daily to ground the work in real project documents.
- Partner with engineers on technical and AI aspects, with no programming needed.
- Meet with colleagues on-site in San Francisco for roughly one week each month.
What we're looking for
- About 8 to 12+ years in construction project management, with a record of leading projects or the managers who run them from planning through delivery.
- Confident skill in interpreting plan sets and technical drawings.
- A background at a general contractor, ideally one of the larger national firms.
- A history of overseeing several large, complicated builds in the US.
- Residence in the United States.
- Availability to join teammates in person about one week a month.
- Curiosity about AI and comfort with new technology.
Bonus points
- Hands-on experience using or building AI tools is a strong plus.
- Civil engineering or construction management education or background.
Compensation and benefits
- Base salary: USD 140,000 to 200,000 per year
- Equity
- Health, dental and vision coverage
- Flexible time off
- Relocation support
Location and work model
- San Francisco, CA, United States
- Hybrid: about 1 week per month in the office
- Full-time
About the company
Our client is a technology company.
From Raydar's careers page, first listed on Rolev.ai on November 12, 2026. Rolev.ai is not the employer.
How Rolev.ai helps with this application
Rolev.ai is a job search and application tool for US job seekers. For this Construction Scheduler role at Raydar, it shows how your resume fits, tailors your resume to the posting, and prepares the application for you to review.
See how you fit
Openings from employer career sites are ranked against your whole resume—and searchable inside Claude, ChatGPT, and Cursor via Rolev.ai MCP.
Tailor without inventing
Every change to your resume is checked against your original. New experience goes in only with your yes—zero fabricated claims.
Draft the full kit
Tailored and Full Match resumes, role-specific cover letters, and answers to employer screening questions are prepared in seconds.
1-Click Extension Autofill
The Chrome extension fills the employer's Greenhouse, Workday, Lever, or Ashby form in 1 click. You review it and press Submit.
Similar roles
- Construction SchedulerBb&E Consulting Engineers And Professionals · Honolulu · $143k – $185k/yr
- Construction SchedulerCumming Group · Los Angeles, CA
- Construction SchedulerNox Group · Pecos, TX
- Construction Scheduler IIHNTB · Miami, FL
- Construction SchedulerPrime Data Centers · Lockhart, TX · $100k – $140k/yr
- Construction Scheduler/Project Controller (Hybrid)Parsons · United States
Common questions
What is the salary for the Construction Scheduler role at Raydar?
The Construction Scheduler posting at Raydar states compensation of $140,000 – $200,000 per year. Final pay may depend on location, experience, and interview evaluation on Raydar's official career site.
Where is the Construction Scheduler job at Raydar located?
This Construction Scheduler position at Raydar is located in San Francisco, CA. Always check Raydar's application page for specific state eligibility or relocation policies.
How do I apply for the Construction Scheduler position at Raydar?
This listing links directly to Raydar's Workable application page. You can apply directly on Raydar's site, or use Rolev.ai to check your resume fit, generate a zero-hallucination tailored resume and cover letter for this posting, and autofill the Workable application form in 1 click with the Rolev.ai Chrome extension. You always review the form and press Submit yourself.